SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: Jun 4, 2024 15:57
Nguồn: SMM
SMM estimates that 1.0117 million mt of pig iron output will be lost from blast furnace maintenance during June 1-7, down 63,100 mt on a weekly basis.

SMM estimates that 1.0117 million mt of pig iron output will be lost from blast furnace maintenance during June 1-7, down 63,100 mt on a weekly basis. SMM estimates that 998,600 mt of pig iron output will be lost from blast furnace maintenance during June 8-14, down 12,100 mt on a weekly basis.

Rebar: 1.1504 million mt of output will be lost from maintenance during June 1-7, up 60,100 mt on a weekly basis; 1.1132 million mt of output will be lost from maintenance during June 8-14, down 37,200 mt on a weekly basis.

HRC: 172,200 mt of output will be lost from maintenance during June 1-7, up 67,200 mt on a weekly basis; 162,600 mt of output will be lost from maintenance during June 8-14, down 9,600 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)