SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: May 28, 2024 14:05
Nguồn: SMM
SMM estimates that 1.0413 million mt of pig iron output will be lost from blast furnace maintenance during May 25-31, down 18,900 mt on a weekly basis.

SMM estimates that 1.0413 million mt of pig iron output will be lost from blast furnace maintenance during May 25-31, down 18,900 mt on a weekly basis. SMM estimates that 988,100 mt of pig iron output will be lost from blast furnace maintenance during Jun 1-7, down 53,200 mt on a weekly basis.

Rebar: 1.0822 million mt of output will be lost from maintenance during May 25-31, down 99,500 mt on a weekly basis; 1.0463 million mt of output will be lost from maintenance during Jun 1-7, down 35,900 mt on a weekly basis.

HRC: 0 mt of output will be lost from maintenance during May 25-31, down 54,600 mt WoW; 0 mt of output will be lost from maintenance during Jun 1-7, flat WoW.


Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn