SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: May 14, 2024 16:31
Nguồn: SMM
SMM estimates that 1.0591 million mt of pig iron output will be lost from blast furnace maintenance during May 11-17, down 190,000 mt on a weekly basis.

SMM estimates that 1.0591 million mt of pig iron output will be lost from blast furnace maintenance during May 11-17, down 190,000 mt on a weekly basis. SMM estimates that 993,900 mt of pig iron output will be lost from blast furnace maintenance during May 18-24, down 65,200 mt on a weekly basis.

Rebar: 1.3673 million mt of output will be lost from maintenance during May 11-17, down 151,600 mt on a weekly basis; 1.1648 million mt of output will be lost from maintenance during May 18-24, down 202,500 mt on a weekly basis.

HRC: 152,800 mt of output will be lost from maintenance during May 11-17, down 19,500 mt on a weekly basis; 12,300 mt of output will be lost from maintenance during May 18-24, down 140,500 mt on a weekly basis.

CRC/galvanising: 23,300 mt of output will be lost from maintenance during May 11-17, up 22,000 mt on a weekly basis; no output will be lost from maintenance during May 18-24, down 23,300 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)