SMM estimates that 1.3359 million mt of pig iron output will be lost from blast furnace maintenance during Apr 27-May 3, down 130,300 mt on a weekly basis. SMM estimates that 1.2223 million mt of pig iron output will be lost from blast furnace maintenance during May 4-10, down 113,600 mt on a weekly basis.
Rebar: 1.5839 million mt of output will be lost from maintenance during Apr 27-May 3, down 71,000 mt on a weekly basis; 1.5558 million mt of output will be lost from maintenance during May 4-10, down 28,100 mt on a weekly basis.
HRC: 161,000 mt of output will be lost from maintenance during Apr 27-May 3, up 89,100 mt on a weekly basis; 128,900 mt of output will be lost from maintenance during May 4-10, down 32,100 mt on a weekly basis.

![Giá Magie Tăng Ba Phiên Liên Tiếp! Phía Chi Phí Vẫn "Nóng Bỏng" Trong Khi Phía Cầu Khó Tiếp Nhận [Bình Luận SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)
![[ Canada áp thuế trả đũa 50% đối với thép Mỹ ]](https://imgqn.smm.cn/usercenter/QMaot20251217171719.jpg)
