SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: Apr 23, 2024 10:54
Nguồn: SMM
SMM estimates that 1.4839 million mt of pig iron output will be lost from blast furnace maintenance during Apr 20-26, down 193,200 mt on a weekly basis.

SMM estimates that 1.4839 million mt of pig iron output will be lost from blast furnace maintenance during Apr 20-26, down 193,200 mt on a weekly basis. SMM estimates that 1.3555 million mt of pig iron output will be lost from blast furnace maintenance during Apr 27-May 3, down 128,400 mt on a weekly basis.

Rebar: 1.5461 million mt of output will be lost from maintenance during Apr 20-26, down 70,200 mt on a weekly basis; 1.431 million mt of output will be lost from maintenance during Apr 27-May 3, down 115,100 mt on a weekly basis.

HRC: 90,400 mt of output will be lost from maintenance during Apr 20-26, up 90,400 mt on a weekly basis; 161,000 mt of output will be lost from maintenance during Apr 27-May 3, up 70,600 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn