SMM Steel Mills Weekly Maintenance Statistics

Đã xuất bản: Apr 9, 2024 10:10
Nguồn: SMM
SMM estimates that 1.8077 million mt of pig iron output will be lost from blast furnace maintenance during Apr 6-12, down 65,500 mt on a weekly basis.

SMM estimates that 1.8077 million mt of pig iron output will be lost from blast furnace maintenance during Apr 6-12, down 65,500 mt on a weekly basis. SMM estimates that 1.7727 million mt of pig iron output will be lost from blast furnace maintenance during Apr 13-19, down 35,000 mt on a weekly basis.

Rebar: 1.6251 million mt of output will be lost from maintenance during Apr 6-12, down 76,000 mt on a weekly basis; 1.5053 million mt of output will be lost from maintenance during Apr 13-19, down 119,800 mt on a weekly basis.

HRC: 21,000 mt of output will be lost from maintenance during Apr 6-12, down 69,000 mt on a weekly basis; 0 mt of output will be lost from maintenance during Apr 13-19, down 21,000 mt on a weekly basis.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn