SMM daily comment on domestic iron ore market (Aug 15)

Đã xuất bản: Aug 16, 2023 17:59
Nguồn: SMM
The most-traded DCE 2401 iron ore contract closed up 1.58% at 740 yuan/mt yesterday.

SHANGHAI, Aug 16 (SMM) –

The most-traded DCE 2401 iron ore contract closed up 1.58% at 740 yuan/mt yesterday. Selling appetites from iron ore traders picked up, while steel mills purchased ores on a need-to basis. The overall market trading was passable. The transaction prices of PB fines in Shandong were mostly 830-835 yuan/mt /mt, up 2-7 yuan/mt on the day. The transaction prices of PB fines in Tangshan were 840 yuan/mt, flat with yesterday.

MLF interest rate cut released yesterday shored up market confidence. Participants believed that this interest rate cut will continue to reduce the financing cost of the real economy and promote economic recovery. However, macro data released yesterday revealed that investment in real estate development declined compared with last month and last year, which dented some optimism. Bolstered by strong supply-demand fundamentals and no definite document on crude steel output limit, short-term iron ore market may swing on a bullish footing.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn
Tin Liên Quan
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
1 phút trước
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Đọc thêm
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Indian integrated logistics and engineering services company Sical Logistics has secured a five-year mining contract worth approximately ₹5.3473 billion from Central Coalfields Limited for heavy earth-moving and mining operations at the SDOC Mine in Bokaro district, Jharkhand. The contract covers the re-handling of approximately 20.14 million cubic metres of overburden, the removal of around 33.65 million cubic metres of hard overburden, and the extraction of approximately 9.104 million tonnes of coal from a 143-hectare working area. The contract value includes an 18% goods and services tax, while the execution period is 1,825 days. A simple five-year average would place the contracted coal volume at approximately 1.82 million tonnes per year.
1 phút trước
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
1 phút trước
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Đọc thêm
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Eastern Coalfields Limited (ECL) said on August 31 that it had begun precautionary sealing measures at Khandra Colliery in the Raniganj coal belt. Surface cracks and ground subsidence were first observed near the Nikanth Temple on July 28. ECL said unauthorised structures and illegal occupants in the affected area had restricted surface-filling work. As the cracks could not be properly filled, external air could enter the underground workings, aggravate the spontaneous heating of residual coal and further increase the risk of spontaneous combustion. ECL therefore initiated the sealing measures to protect employees and surrounding areas and will continue monitoring conditions at the site. Existing employees will be redeployed to other units of the same mine or neighbouring mines according to operational requirements. The sealing measures will not disrupt existing water or electricity supplies to residential quarters. ECL has not determined how long the sealing will remain in place and rejected reports suggesting that the colliery could be sealed for three months. The final duration will be determined based on expert advice, technical assessments and established mine-safety requirements.
1 phút trước
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
1 phút trước
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Đọc thêm
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Extreme drought has lowered river levels in East Kalimantan, disrupting transportation operations for some coal producers. Data from Indonesia’s meteorological agency showed that East Kalimantan received almost no rainfall in August. To prevent barges from running aground, local producers have been forced to reduce their coal loads. A local port official said that barges normally capable of carrying 7,000 tonnes of coal are currently limited to approximately 5,500 tonnes, representing a reduction of 1,500 tonnes, or about 21.4%, per trip. Some barges continue to face difficulties travelling upstream despite carrying reduced loads. The industry group noted that the decline in carrying capacity per trip will require more voyages and raise logistics costs.
1 phút trước
SMM daily comment on domestic iron ore market (Aug 15) - Shanghai Metals Market (SMM)