The Waitoushan Iron Ore Mine mine made every effort to overcome unfavourable factors such as narrow stope space and completed a combined 20.4872 million mt of mining and stripping from January to May, a year-on-year increase of 6.3191 million mt; ore recycling from dump site stood at 1.35 million mt, up 471,000 mt year-on-year.
The mine raised ore grades and improved management level. From January to May, the output of iron ore concentrate was 1.202 million mt, up 106,900 mt from the same period last year.

![Giá Magie Tăng Ba Phiên Liên Tiếp! Phía Chi Phí Vẫn "Nóng Bỏng" Trong Khi Phía Cầu Khó Tiếp Nhận [Bình Luận SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)
![[SMM tồn kho than cốc và than luyện cốc] Tuần này, tồn kho than cốc tại các doanh nghiệp luyện cốc là 449.000 tấn](https://imgqn.smm.cn/usercenter/EXHJE20251217171720.jpg)
