Zimbabwe Chromium Industry Capacity Upgrading Project Officially Put into Operation

Đã xuất bản: Feb 8, 2023 16:59
On January 23, 2023, Furnace No. 1 of the Zimbabwe Chromium Ferrochrome Production Capacity Upgrade Project was officially ignited and put into operation.

On January 23, 2023, Furnace No. 1 of the Zimbabwe Chromium Ferrochrome Production Capacity Upgrade Project was officially ignited and put into operation. The project was officially launched in 2022 with Hunan Shunfa providing all the funds. The project adopted the domestic mature semi-closed submerged arc furnace technology to upgrade No. 1 and No. 2 furnaces. The No. 2 furnace with a designed annual output of 87,600 mt of ferrochrome is expected to be completed by the end of March.

Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn
Zimbabwe Chromium Industry Capacity Upgrading Project Officially Put into Operation - Shanghai Metals Market (SMM)