SHANGHAI, Aug. 31 (SMM) – The Copperbelt Energy Corporation (CEC) said to resume full power supply to Mopani Copper Mines from Wednesday, according to Amos Chand, Special Assistant to the President for Press and Public Relations.
Details will be concluded over an agreed period of six (6) weeks.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.
![Giá đồng tăng vọt; doanh nghiệp sử dụng phế liệu mua vào thận trọng [SMM Nhận định hàng ngày đồng thứ cấp]](https://imgqn.smm.cn/usercenter/uoTGi20251217171713.jpg)

![Nguồn cung châu Phi thu hẹp, nhập khẩu anode đồng của Trung Quốc giảm so với tháng trước trong tháng 8/2026 [Phân tích SMM]](https://imgqn.smm.cn/usercenter/TlzAr20251217171709.jpg)
