SHANGHAI, Mar. 22 (SMM) – Tsingshan Group has put online its whole phase two project, with total capacity of 60,000-tpy (metal content), in Indonesia recently, SMM learns.
Tsingshan Group started production at its phase two project last December, but power supply issues restricted its production capacity, only 30,000-tpy capacity online.
This March, the Group succeeded to produce from the rest of the project, SMM learns.
Tsingshan Group started its trial production at its phase one project in January 2015, producing 20,000 tonnes (metal content) over the year, and will complete construction of phase three project in 2017, according to its plan.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

![Chỉ số giá sản xuất (PPI) tháng 8 của Mỹ vượt kỳ vọng, thúc đẩy kỳ vọng tăng lãi suất; hợp đồng thiếc giao dịch nhiều nhất trên SHFE giảm xuống dưới mốc 410.000 nhân dân tệ [SMM Đánh giá giữa phiên về thiếc]](https://imgqn.smm.cn/usercenter/gbiCe20251217171750.jpg)
![SHFE thiếc đóng cửa ở mức 414.050 (-2,18%) qua đêm, cả phe mua và phe bán đều thận trọng trước khi dữ liệu CPI ngày 11 tháng 9 được công bố [Bản tin sáng SMM Thiếc]](https://imgqn.smm.cn/usercenter/LLUUJ20251217171751.jpeg)
