Zijin Mining Put 3.3 Million-tpy Lead and Zinc Ore Processing Project into Trial Production

Đã xuất bản: Sep 23, 2015 12:09 (GMT+8)
Zijin Mining entered trial production of its 3.3 million-tpy lead and zinc ore processing project in Inner Mongolia’s Urat Rear Banner, bynrnews.com reports.

SHANGHAI, Sept. 23 (SMM) - Zijin Mining entered trial production of its 3.3 million-tpy lead and zinc ore processing project in Inner Mongolia’s Urat Rear Banner recently, bynrnews.com reports.

The project was commenced in 2009, and is scheduled for commissioning in the latter half of this year. Once operational, its daily ore processing capacity will reach 10,000 tonnes. The project’s zinc ore output will be 70,000 tpy (zinc content), with lead ore output of 10,000 tpy (lead content) and 360,000 tpy of standard sulfur. 

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 


Tuyên bố về Nguồn Dữ liệu: Ngoại trừ thông tin công khai, tất cả dữ liệu khác được SMM xử lý dựa trên thông tin công khai, giao tiếp thị trường và dựa trên mô hình cơ sở dữ liệu nội bộ của SMM. Chúng chỉ mang tính chất tham khảo và không cấu thành khuyến nghị ra quyết định.

Để biết thêm thông tin hoặc có thắc mắc gì, vui lòng liên hệ: lemonzhao@smm.cn
Để biết thêm thông tin về cách truy cập báo cáo nghiên cứu, vui lòng liên hệ:service.en@smm.cn