The List of Winning Candidates for the 100MW/200MWh ESS PC Supporting the PV Power Generation Composite Project in Shizuishan, Ningxia Has Been Announced.

Published: Apr 25, 2025 18:03

Polaris Energy Storage Network learned that the supporting 100MW/200MWh ESS project for the 1,000MW PV power generation composite project in Shizuishan City by Ningxia Xinghai New Energy Co., Ltd. has announced the winning candidates for the PC project.

The first winning candidate is China Railway 11th Bureau Group Co., Ltd., with a bid price of 1.1598 billion yuan, equivalent to a unit price of 0.58 yuan/Wh.

The second winning candidate is China Construction Third Engineering Bureau Group Co., Ltd., with a bid price of 1.1670 billion yuan, equivalent to a unit price of 0.584 yuan/Wh.

The third winning candidate is PowerChina Beijing Engineering Corporation Limited, with a bid price of 1.1692 billion yuan, equivalent to a unit price of 0.585 yuan/Wh.

The bid inviter is Ningxia Xinghai New Energy Co., Ltd., and the construction site is located in Hongyazi Township, Pingluo County, Shizuishan City.

The project involves the construction of a new 100MW/200MWh ESS power station, with the main construction content including the installation of 20 sets of 5MW/10MWh liquid-cooled ESS units. Each 5/10MWh liquid-cooled battery system consists of battery modules, combiner cabinets, BMS systems, temperature control systems, and fire protection systems. Each 10MWh ESS unit includes 24 battery clusters, with each cluster containing 4 battery modules, and the battery modules are formed by 1P104S battery cells.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
23 hours ago
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Read More
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Recent 'EIA' data shows rooftop solar now makes up 20% of Puerto Rico's power capacity (1,456 MW), surpassing natural gas as the second-largest source. Between 2016 and 2025, distributed solar accounted for 81% of all new capacity. To combat frequent grid outages, residents have deployed over 171,000 battery systems (2,864 MWh), with many joining grid operator LUMA's virtual power plant ('VPP') program. Despite this progress, new legislation extended the territory's sole coal plant to 2032 and removed interim renewable targets, though the 100% goal for 2050 remains.
23 hours ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Apr 3, 2026 09:59
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Read More
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
The US solar industry faces a 53,000-worker shortfall as developers rush to meet the July 2026 construction deadline under the 'OBBBA'. Projections indicate 355,000 workers are needed to hit the 60-70 GW installation targets, yet 86% of employers report hiring difficulties. The labor crunch is compounded by a mandate requiring 15% of labor hours to come from apprentices to secure tax credits. To adapt, developers are building internal training pipelines, targeting veterans, and utilizing digital tools to maximize efficiency.
Apr 3, 2026 09:59