Angang Powder Materials Ultra-High Power Graphite Electrode Tender Announcement

Published: May 25, 2026 13:27

1 Tender Conditions

The bid inviter for this tender project, Ansteel Powder Materials Ultra-High Power Graphite Electrodes (AGGZZBHGZHD260525290631), is the Tender Management Office of the Procurement and Supply Center of Ansteel Group Engineering Technology Development Co., Ltd. The project funds are self-raised. The project has met the tender conditions, and open tendering is now conducted.

2 Project Overview and Tender Scope

2.1 Project Name: Ansteel Powder Materials Ultra-High Power Graphite Electrodes

2.2 Conversion to other procurement methods upon tender failure: No conversion

2.3 The tender content, scope, and scale of this project are detailed in the attachment "Material List Attachment.pdf".

3 Bidder Qualification Requirements

3.1 Joint venture bidding is not permitted in this tender.

3.2 This tender requires bidders to possess the following qualification requirements:

(1) Production-type quality management system certification

(2) Production-type business license

3.3 This tender requires bidders to meet the following registered capital requirements:

Production-type registered capital: 5 million yuan and above

3.4 This tender requires bidders to possess the following performance requirements:

Supply performance of similar products after January 1, 2022 (one contract and corresponding invoice)

3.5 This tender requires bidders to possess the following capability requirements, financial requirements, and other requirements:

Financial requirements: See attachments for details (if applicable)

Capability requirements: See attachments for details (if applicable)

Other requirements: See attachments for details (if applicable)

3.6 This tender requires that for projects subject to mandatory tendering by law, bids from persons subject to enforcement for breach of trust shall be invalid.

4 Obtaining Tender Documents

4.1 All parties interested in bidding are requested to log in to the Ansteel Smart Tender and Bid Platform at http://bid.ansteel.cn to download the electronic tender documents from 13:00 on May 25, 2026 to 13:00 on June 15, 2026 (Beijing time, the same hereinafter).

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Domestic Dynamics: Sunwoda 50,000-Ton Battery Recycling Phase I Begins Production】
Common.Time.hoursAgo
【Domestic Dynamics: Sunwoda 50,000-Ton Battery Recycling Phase I Begins Production】
Read More
【Domestic Dynamics: Sunwoda 50,000-Ton Battery Recycling Phase I Begins Production】
【Domestic Dynamics: Sunwoda 50,000-Ton Battery Recycling Phase I Begins Production】
【Domestic Dynamics: Sunwoda 50,000-Ton Battery Recycling Phase I Begins Production】 Tengzhou Sunwoda's Phase I lithium-ion battery recycling project has commenced full production in 2026. Spanning 200 acres, the facility fills a critical downstream gap in the regional new energy supply chain. ​Operating on a closed-loop model, its 1.1-km automated line can process 50,000 tons of waste batteries annually—equivalent to recycling 60,000 EVs. ​The highly automated line integrates dismantling, pyrolysis, crushing, and restoration, achieving a 98.5% core element recovery rate to produce high-value black mass. ​By converting waste into lithium, nickel, and cobalt, the project resolves local material shortages and enhances regional supply chain security.
Common.Time.hoursAgo
【SMM New Energy News】Shenzhen 15th Five-Year Plan Aims for World-Class Advanced Energy Storage Center
Common.Time.hoursAgo
【SMM New Energy News】Shenzhen 15th Five-Year Plan Aims for World-Class Advanced Energy Storage Center
Read More
【SMM New Energy News】Shenzhen 15th Five-Year Plan Aims for World-Class Advanced Energy Storage Center
【SMM New Energy News】Shenzhen 15th Five-Year Plan Aims for World-Class Advanced Energy Storage Center
The Shenzhen 15th Five-Year Plan outline proposes accelerating the construction of a world-class new energy storage industry center, promoting the entire "generation-grid-load-storage" chain. Meanwhile, Shenzhen will expand its local NEV manufacturing scale, aiming for strategic emerging industry added value to top RMB 2.3 trillion by 2030.
Common.Time.hoursAgo
【SMM New Energy News】Multi-User Direct Green Power Policy Launched, Boosting C&I Storage
Common.Time.hoursAgo
【SMM New Energy News】Multi-User Direct Green Power Policy Launched, Boosting C&I Storage
Read More
【SMM New Energy News】Multi-User Direct Green Power Policy Launched, Boosting C&I Storage
【SMM New Energy News】Multi-User Direct Green Power Policy Launched, Boosting C&I Storage
The NDRC and NEA officially issued a multi-user direct green power connection policy, expanding the consumption model from "one-to-one" to "one-to-many." This makes C&I energy storage a regulatory necessity. Driven by this policy, market enthusiasm for new energy and storage supply chains rose, boosting relevant ETFs and stocks like CATL and Sungrow.
Common.Time.hoursAgo