[SMM Manganese Ore Weekly Review] Demand Lacks Strength, Wait-and-See Sentiment Dominates

Published: Jul 3, 2026 17:25
July 3 Brief: Northern ports: South African high-iron ore 30.5-31.4 yuan/mtu, down WoW; South African semi-carbonate ore 37.2-37.7 yuan/mtu, flat WoW; Gabonese ore 40.6-41 yuan/mtu, flat WoW; 46% Australian lumps 43.3-43.8 yuan/mtu, flat WoW; South African medium-iron ore 37-37.5 yuan/mtu, flat WoW. Southern ports: South African high-iron ore 33.5-34 yuan/mtu, down WoW; South African semi-carbonate ore 36.5-37 yuan/mtu, flat WoW; Gabonese ore 41-41.5 yuan/mtu, flat WoW; 46% Australian lumps 43.2-43.7 yuan/mtu, down WoW; South African medium-iron ore 37-37.5 yuan/mtu, flat WoW. The manganese ore market is stable but stagnant, end-use demand is weak, and buying and selling are dominated by wait-and-see sentiment.

July 3 news flash:

North ports: South African high-iron 30.5-31.4 yuan/mtu, lower WoW; South African semi-carbonate 37.2-37.7 yuan/mtu, flat WoW; Gabonese 40.6-41 yuan/mtu, flat WoW; 46% Australian lumps 43.3-43.8 yuan/mtu, flat WoW; South African medium-iron 37-37.5 yuan/mtu, flat WoW.

South ports: South African high-iron 33.5-34 yuan/mtu, lower WoW; South African semi-carbonate 36.5-37 yuan/mtu, flat WoW; Gabonese 41-41.5 yuan/mtu, flat WoW; 46% Australian lumps 43.2-43.7 yuan/mtu, lower WoW; South African medium-iron 37-37.5 yuan/mtu, flat WoW.

The manganese ore market was in a stable stalemate, with sluggish end-use demand absorption and a prevailing wait-and-see sentiment among buyers.

Supply side, Consolidated Minerals Limited (CML) released its August 2026 offers to China, with Australian lump (Mn>46% Fe<4% SiO2<18%) quoted at $5.3/mtu, down $0.3/mtu MoM. As high-priced manganese ore arrived at ports, traders' willingness to sell at discounts waned, and port spot cargoes came under pressure, though miners still largely held prices firm.

Demand side, SiMn futures were in the doldrums, fostering a strong wait-and-see sentiment that failed to boost spot procurement. In the spot market, capacity releases in Inner Mongolia coincided with blast furnace maintenance, keeping manganese ore purchase willingness tepid. In Ningxia, producer operating rates fluctuated relatively little and mills maintained some degree of buying interest; south China alloy plants generally operated at low rates, purchasing only as needed for rigid demand, with the market atmosphere remaining sluggish. At this stage, SiMn enterprises mostly adopted a restocking-as-needed, small-parcel transactionsprocurement strategy, and post-holiday market activity was muted, with deals dominated by sporadic small parcels and marginal manganese ore demand weakening further.

Inventory side, Tianjin Port and Qinzhou Port saw inventory buildup, with manganese ore stocks at relatively high levels, capping price gains.

On the cost side, ore prices were well-supported at the bottom, but weakness in downstream alloy demand and mills' restocking-as-needed approach limited upside room. In the near term, port manganese ore prices were expected to move sideways on elevated costs, with the trend tending toward stagnant, leaving limited room both upward and downward.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
Common.Time.hoursAgo
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
Read More
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM and Codelco's lithium joint venture, Novandino, has outlined plans in an environmental impact assessment (EIA) filing to increase annual lithium production capacity from around 270,000 mt currently to as much as 470,000 mt. The expansion is aimed at meeting long-term demand from electric vehicles and grid-scale energy storage. According to the filing, production will first gradually rise to around 300,000 mt before transitioning over seven years to an integrated production system incorporating direct lithium extraction (DLE), with additional capacity expected to come online over several years.
Common.Time.hoursAgo
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Jul 3, 2026 22:44
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Read More
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
According to an industry letter seen by Reuters, exporters have been unable to submit export declarations through the customs platform since July 1 because ARECOMS, the Democratic Republic of Congo's strategic minerals regulator, has not formally notified customs to continue processing export quotas. As a result, major producers including CMOC Group, Glencore, Eurasian Resources Group (ERG) and Huayou Cobalt have been unable to complete export procedures. Meanwhile, ARECOMS requires companies to utilize their first-half export quotas by July 5, after which any unused volumes will be withdrawn and reallocated. Industry sources estimate that around 60%–75% of companies are unlikely to meet the deadline due to administrative delays. If the issue is not resolved promptly, up to 20,000 tonnes of cobalt exports, worth approximately US$1.1 billion at current prices, could be affected. CMOC alone could lose almost all of its second-quarter export quota. SMM will continue to monitor developments.
Jul 3, 2026 22:44
Tinci Materials Terminates 243,000-tpy Lithium Battery Materials Project
Jul 3, 2026 20:29
Tinci Materials Terminates 243,000-tpy Lithium Battery Materials Project
Read More
Tinci Materials Terminates 243,000-tpy Lithium Battery Materials Project
Tinci Materials Terminates 243,000-tpy Lithium Battery Materials Project
Tinci Materials announced that its subsidiary Nantong Tinci has terminated its planned 243,000-tpy lithium battery and fluorochemical materials project. The company said the decision was driven by an oversupply in the electrolyte industry, intensified market competition, and changes in the fluorochemical market, which weakened the project's expected returns. Tinci has begun evaluating new product plans for its Nantong facility.
Jul 3, 2026 20:29
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here