[SMM PV] Macao plans to install solar power generation systems in new public buildings and sports venues.

Published: Jun 17, 2026 14:22

According to Macao Radio, the SAR government is encouraging the gradual expansion of green energy use, and has planned to install solar PV power generation systems in new public buildings and sports venues. The Environmental Protection Bureau said that a super charging station for light and heavy vehicles will be set up in the Cotai area in mid-2026, and more charging and battery swapping facilities will be added at existing or temporary public car parks and on public streets in the future, based on community needs and site conditions, to continuously enhance the convenience of using EVs.

Legislative Assembly member Liang Hongxi submitted a written interpellation concerning the impact of international energy price fluctuations on Macao and the promotion of the society’s transition from oil to electricity. In response, the Environmental Protection Bureau, after consulting the Economic and Technological Development Bureau, the Consumer Council, and the Social Welfare Bureau, said the SAR government continuously monitors the fuel supply and price stability in Macao, actively maintains close communication with the fuel industry through the interdepartmental fuel inspection team, and calls for various discounts.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Solar: HVR Solar to build 1.2GW TOPCon cell factory in India]
59 mins ago
[Solar: HVR Solar to build 1.2GW TOPCon cell factory in India]
Read More
[Solar: HVR Solar to build 1.2GW TOPCon cell factory in India]
[Solar: HVR Solar to build 1.2GW TOPCon cell factory in India]
Indian PV manufacturer and EPC company HVR Solar plans to enter solar cell manufacturing with a 1.2GW annual production facility in Amroha, Uttar Pradesh. The company signed MoUs with several international technology partners during SNEC 2026, including Shenzhen Han’s Photovoltaic Equipment for TOPCon cell equipment, Gentech Technology for chemical and gas utility systems, and Indygreen Technologies for production line integration. HVR said the project will support India’s domestic renewable supply chain, reduce import reliance and create more than 500 direct jobs
59 mins ago
[Solar: European Energy commissions 148MW solar park in Latvia]
1 hour ago
[Solar: European Energy commissions 148MW solar park in Latvia]
Read More
[Solar: European Energy commissions 148MW solar park in Latvia]
[Solar: European Energy commissions 148MW solar park in Latvia]
Denmark-based European Energy has inaugurated the 148MW Tārgale Solar Park in Latvia. Located in Ventspils Municipality, the EUR 80 million project is expected to generate around 154,550MWh of electricity annually, enough to supply about 60,000 households. The project is supported by a 110MW corporate PPA with Apple, which European Energy says is among the largest single-plant corporate PPAs in the Baltic region. The project was developed with local stakeholders and is co-owned by European Energy and Danish pension fund Sampension.
1 hour ago
[Solar: FRV secures 2.3GW of grid capacity in Germany]
1 hour ago
[Solar: FRV secures 2.3GW of grid capacity in Germany]
Read More
[Solar: FRV secures 2.3GW of grid capacity in Germany]
[Solar: FRV secures 2.3GW of grid capacity in Germany]
Fotowatio Renewable Ventures, part of Jameel Energy, has secured 2.3GW of transmission grid capacity in Germany to support battery storage, solar PV and hybrid renewable projects. FRV said grid access has become a decisive factor for large-scale renewable and storage projects in Germany. The secured portfolio is expected to reach ready-to-build status between 2026 and 2029 across regions including Brandenburg, Lower Saxony and North Rhine-Westphalia, covering 2-hour and 4-hour BESS projects, solar PV plants and hybrid projects.
1 hour ago