[SMM Steel Monthly Shipping] China's 32-Port Departures in April Edged Up 16.75% MoM

Published: May 7, 2026 13:20

According to the latest SMM steel shipping data, total steel exports from 32 domestic ports in April reached 11.8668 million mt, up 16.75% MoM. Among main ports, Shanghai Port recorded steel port departures of 660,400 mt in April, a MoM increase of 23.67%; Tianjin Xingang recorded steel port departures of 3.0514 million mt in April, a MoM increase of 54.07%; Caofeidian Port recorded steel port departures of 505,300 mt in April, a MoM increase of 144.34%; Jingtang Port recorded steel port departures of 726,900 mt in April, a MoM increase of 24.85%. Port departures from Zhangjiagang, Fangchenggang, Bayuquan, Luojing Port, and Zhanjiang Port all declined to varying degrees MoM.

Data Source Disclaimer: Data other than publicly available information is derived from public information, market communication, and SMM's internal database models, processed by SMM for reference only and does not constitute decision-making advice.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SMM Iron & Steel] ArcelorMittal Kryvyi Rih Suspends Steel Production Due to Severe Logistics Disruptions
50 mins ago
SMM Iron & Steel] ArcelorMittal Kryvyi Rih Suspends Steel Production Due to Severe Logistics Disruptions
Read More
SMM Iron & Steel] ArcelorMittal Kryvyi Rih Suspends Steel Production Due to Severe Logistics Disruptions
SMM Iron & Steel] ArcelorMittal Kryvyi Rih Suspends Steel Production Due to Severe Logistics Disruptions
ArcelorMittal Kryvyi Rih (AMKR) has announced a temporary suspension of its steel and rolled product manufacturing for at least four days, starting May 5, 2026, due to critical damage to the railway infrastructure connecting the plant to Black Sea ports. The logistics bottleneck, caused by repeated strikes on the Odesa-Chornomorsk bridge, has paralyzed the export of iron ore concentrate and finished steel, forcing the company to idle Blast Furnace No. 6. While the plant aimed for a 2026 production target of 5.3 million metric tons (mt) of iron ore concentrate and 3.8 million mt of crude steel, this disruption threatens to tighten the supply of long products in the European and North African markets.
50 mins ago
[SMM Iron & Steel] US Issues Preliminary AD Results for Large Diameter Welded Pipe from India
50 mins ago
[SMM Iron & Steel] US Issues Preliminary AD Results for Large Diameter Welded Pipe from India
Read More
[SMM Iron & Steel] US Issues Preliminary AD Results for Large Diameter Welded Pipe from India
[SMM Iron & Steel] US Issues Preliminary AD Results for Large Diameter Welded Pipe from India
The US Department of Commerce (DOC) has announced the preliminary results of its administrative review of the antidumping (AD) duty order on large diameter welded pipe from India for the period of May 1, 2023, to April 30, 2024. The DOC preliminarily found that Welspun Corp Limited and its affiliates did not sell the subject merchandise at less than normal value, assigning a dumping margin of 0.00%. Additionally, the review was rescinded for 12 other Indian companies as they had no reviewable shipments during the period. This preliminary zero-margin finding for a major producer suggests a potential easing of trade barriers for specific Indian pipe exports, though final results are pending.
50 mins ago
[SMM Iron & Steel] US Steel Mill Shipments Surged 10.9% in March 2026; Q1 Down Slightly
51 mins ago
[SMM Iron & Steel] US Steel Mill Shipments Surged 10.9% in March 2026; Q1 Down Slightly
Read More
[SMM Iron & Steel] US Steel Mill Shipments Surged 10.9% in March 2026; Q1 Down Slightly
[SMM Iron & Steel] US Steel Mill Shipments Surged 10.9% in March 2026; Q1 Down Slightly
The American Iron and Steel Institute (AISI) reported that US steel mills shipped 7.74 million net tons in March 2026, marking a 10.9% increase from the 6.98 million net tons shipped in February, though down 0.6% compared to March 2025. Total shipments for the first quarter of 2026 reached 21.82 million net tons, a 1.6% decrease year-on-year. Specifically, shipments of corrosion-resistant steel rose by 12%, cold rolled sheets by 11%, and hot rolled sheets by 6% compared to the previous month. The significant monthly rebound indicates a seasonal recovery in manufacturing and construction demand, though the slight year-on-year decline suggests the market is still adjusting to broader economic cooling compared to the previous year.
51 mins ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here
[SMM Steel Monthly Shipping] China's 32-Port Departures in April Edged Up 16.75% MoM - Shanghai Metals Market (SMM)