[SMM Survey] Rolling Mills Shut Down Due to Poor Profitability, Rebar and Wire Rod Supply Declined Simultaneously

Published: Apr 28, 2026 10:30
During the survey period (April 21–April 27), both the operating rates and capacity utilization rates of rebar and wire rod in the Central China region declined.

During the survey period (April 21–April 27), both the rebar rolling line operating rate and capacity utilization rate in the Central China region declined.

Specifically, some electric furnace mills in Hubei reduced operating hours and simultaneously halted rolling lines due to poor recent profitability. Meanwhile, some steel mills in Henan chose to cut rebar output and shift to hot-rolled coil production, as hot-rolled coil profitability outperformed rebar. Under these combined effects, rebar supply decreased this week. On the mill inventory side, during the survey period, futures trended upward continuously, market trading activity was moderate, and with the Labour Day holiday approaching, some pre-holiday stockpiling demand was released, leading to continued inventory destocking at steel mills.

Rebar supply in the Central China region is expected to decline further in the next period, mainly because some steel mills in Hubei shut down one rebar rolling line during the current period, and the number of operating days in the next period will be fewer than the current period, resulting in a decrease in capacity utilization rate.

 

During the survey period (April 21–April 27), both the operating rate and capacity utilization rate of wire rod rolling lines in the Central China region declined.

Specifically, during the survey period, some steel mills in Henan shifted production to sheets & plates to reduce wire rod production driven by profitability, while some electric furnace mills in Hubei saw declining profitability and chose to shut down one wire rod rolling line. Under the combined impact, wire rod supply in the region shifted from increasing to decreasing. On the mill inventory side, during the survey period, rebar futures showed an upward trend, regional wire rod shipments improved, and inventory continued to decline.

It is expected that wire rod rolling line supply in the Central China region will still see a slight decrease in the next period, mainly because one wire rod rolling line was shut down in the current period, and the number of operating days in the next period will be fewer than in the current period, leading to a decline in capacity utilization rate.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ZCE: Adjusting Trading Margin Standards and Price Limit Ranges for Certain Futures Contracts During the 2026 Labor Day Holiday
16 hours ago
ZCE: Adjusting Trading Margin Standards and Price Limit Ranges for Certain Futures Contracts During the 2026 Labor Day Holiday
Read More
ZCE: Adjusting Trading Margin Standards and Price Limit Ranges for Certain Futures Contracts During the 2026 Labor Day Holiday
ZCE: Adjusting Trading Margin Standards and Price Limit Ranges for Certain Futures Contracts During the 2026 Labor Day Holiday
16 hours ago
【SMM Steel】US finalizes AD/CVD rulings on chassis from Mexico, Thailand, Vietnam
17 hours ago
【SMM Steel】US finalizes AD/CVD rulings on chassis from Mexico, Thailand, Vietnam
Read More
【SMM Steel】US finalizes AD/CVD rulings on chassis from Mexico, Thailand, Vietnam
【SMM Steel】US finalizes AD/CVD rulings on chassis from Mexico, Thailand, Vietnam
【SMM Steel】The USDOC issued final AD/CVD determinations on certain chassis from Mexico, Thailand, and Vietnam on Apr 21, 2026. Mexico faces AD: 32.37% (cash deposit: 0% after subsidy offsets) and CVD: 76.91%. Thailand: AD 72.85-129.63% (adjusted same), CVD 9.65-10.72%. Vietnam: AD 186.84%. The USDOC initiated the probes on Mar 18, 2025. Goods under HS 8716.39.0090, 8716.90.5060.
17 hours ago
【SMM Steel】Marubeni-Itochu Steel America plans $37m+ Arkansas steel facility
17 hours ago
【SMM Steel】Marubeni-Itochu Steel America plans $37m+ Arkansas steel facility
Read More
【SMM Steel】Marubeni-Itochu Steel America plans $37m+ Arkansas steel facility
【SMM Steel】Marubeni-Itochu Steel America plans $37m+ Arkansas steel facility
【SMM Steel】Marubeni-Itochu Steel America Inc. plans to build an advanced flat-rolled steel processing plant in Osceola, Arkansas, with an investment of over $37m, creating 35 high-paying jobs in Mississippi County. MISA Specialty Processing, a subsidiary, will manage the facility. Adjacent to Big River Steel, the service center will serve customers including automotive markets in the South-Central US. MISA's President & CEO expressed confidence in the local workforce and in building business in North America. MSP's president said the company values the region's steel industry legacy.
17 hours ago
[SMM Survey] Rolling Mills Shut Down Due to Poor Profitability, Rebar and Wire Rod Supply Declined Simultaneously - Shanghai Metals Market (SMM)