[SMM Aluminum Flash News] ABB Secures Repeat Order from Arconic to Improve Aluminum Efficiency
ABB has secured a repeat order from Arconic to supply a fifth electromagnetic stirrer (AL-EMS) for its Hungary plant, to be installed on a 52-tonne aluminum melting furnace with commissioning in early 2027. The move follows earlier installations since 2023 and aims to replace traditional stirring systems to improve efficiency and stability. Arconic said the system enhances melt uniformity and product quality, while reducing maintenance needs, cutting downtime by about 10 days per furnace annually and halving dross removal time. Overall, the technology improves cast house efficiency, energy use and safety.