[SMM Analysis ] The production capacity of Lithium Argentina will reach 235,000 tonnes in 2038.

Published: Mar 31, 2026 22:15

In late this month, Lithium Argentina announced its fourth quarter and full-year 2025 results, along with an outlook on subsequent expansion plans.

  • The company holds a 44.8% equity interest in the Cauchari-Olaroz project.

  • The company's flagship Cauchari-Olaroz project currently has an annual production capacity of 40,000 tons, with plans to expand by 45,000 tons per year.

  • In the fourth quarter of 2025, the company produced approximately 9,700 tons of lithium carbonate. For the full year of 2025, production reached 34,100 tons, including 359 tons of lithium chloride (in LCE terms) produced and sold to Ganfeng Lithium in the first half of 2025 to support the startup of Ganfeng's Mariana project. 2025 production reached the upper end of the guidance range of 30,000-35,000 tons, representing a 34% increase year-over-year compared to 2024.

  • Cost of sales in the fourth quarter of 2025 was US$66 million, with cash operating costs for lithium carbonate at US$5,618 per ton. The reduction in operating costs was driven by structural optimization and operational efficiency improvements, with these cost-saving effects expected to be sustainable. Revenue in the fourth quarter of 2025 was US$92 million, with an average realized selling price for lithium carbonate of approximately US$9,049 per ton. Due to a significant increase in market prices since late 2025, the average realized selling price for lithium carbonate in the first quarter of 2026 is expected to be approximately US$17,000 per ton.

  • 2026 production guidance for lithium carbonate is set at 35,000-40,000 tons. With continued optimization and lean operations, production is expected to steadily increase in 2026, supporting the project's long-term operational performance.

Regarding the PPG project and Cauchari-Olaroz expansion:

  • Cauchari-Olaroz Stage 2 Expansion: The Cauchari-Olaroz project is advancing expansion plans, aiming to add 45,000 tons per year of lithium carbonate production capacity.

  • Measured and indicated lithium resources increased by 42%, reaching 28.1 million tons of lithium carbonate equivalent, with an average lithium grade of 562 mg/L.

  • Leveraging the better-than-expected operational performance of the Cauchari-Olaroz project, the 5,000-ton-per-year DLE plant will continue to be built, with the first unit to be deployed at Ganfeng Lithium's adjacent Mariana project for technology integration and operational validation.

  • The Stage 2 expansion plan, incorporating DLE technology, is expected to be completed by mid-2026.

  • The application for the Large Investment Incentive Regime (RIGI) and the environmental permit for the Stage 2 project were both submitted in December 2025.

    PPG Project: Three-phase integrated development, with a total target capacity of 150,000 tonnes/year LCE

  • PPG is expected to have an annual capacity of 25,000 tonnes when it begins production in 2029, subsequently increasing to 50,000 tonnes in 2031, 100,000 tonnes in 2034, and reaching the design capacity of 150,000 tonnes/year in 2038.

  •  The detailed preliminary study was completed in December 2025. Based on the assumption of a lithium carbonate price of US$18,000/tonne, the project's after-tax net present value (at an 8% discount rate) is US$8.1 billion, with an internal rate of return (IRR) of 33%.

  • Phase 1 environmental permit was obtained in November 2025, and the RIGI application was submitted in February 2026.

  • Integration of the new joint venture company for the PPG project has been largely completed, with the closing expected in the second quarter of 2026.

  • Ganfeng Lithium and Lithium Argentina are in discussions with potential customers and strategic partners on financing solutions, while simultaneously advancing offtake and minority equity cooperation.

The company is considering applying for a secondary listing on the Australian Securities Exchange (ASX) or the Hong Kong Stock Exchange (HKEX), to broaden its investor base in the Asia-Pacific region while maintaining its listing on the New York Stock Exchange.

Source: Lithium Argentina official website, compiled by SMM

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Sungrow: The Global Energy Storage Market Is Expected to Grow by 30–50 in 2026
3 hours ago
Sungrow: The Global Energy Storage Market Is Expected to Grow by 30–50 in 2026
Read More
Sungrow: The Global Energy Storage Market Is Expected to Grow by 30–50 in 2026
Sungrow: The Global Energy Storage Market Is Expected to Grow by 30–50 in 2026
At a conference call on March 31, Sungrow stated regarding the company’s overall target plan for energy storage shipments in 2026 that the global market is expected to grow by 30–50 in 2026. With raw material prices rising, some projects were in a wait-and-see stage, but the demand should still exist and would only be deferred. The company will strive based on the upper end of market growth, hoping to achieve more than 60 Gwh.
3 hours ago
SK Innovation E&S Launches Largest ESS Facility in New York
3 hours ago
SK Innovation E&S Launches Largest ESS Facility in New York
Read More
SK Innovation E&S Launches Largest ESS Facility in New York
SK Innovation E&S Launches Largest ESS Facility in New York
SK Innovation E&S has completed and begun operations of the largest energy storage system (ESS) facility in New York State. According to industry sources on the 31st, its subsidiary KCE launched the KCE NY 6 battery storage facility located on Electric Avenue in Blasdell, Erie County. The project, with a capacity of 20MW (45.6MWh), is the largest single ESS site constructed in New York at the time of its commissioning and is directly connected to the local power grid.
3 hours ago
Tozero Launches Industrial Demo Plant to Recover Lithium from Waste Batteries
3 hours ago
Tozero Launches Industrial Demo Plant to Recover Lithium from Waste Batteries
Read More
Tozero Launches Industrial Demo Plant to Recover Lithium from Waste Batteries
Tozero Launches Industrial Demo Plant to Recover Lithium from Waste Batteries
German company, Tozero, announced on March 27 (local time) the official launch of its industrial-scale demonstration plant. The company has built a facility at the Gendorf chemical park in Bavaria, Germany, capable of processing more than 1,500 tons of waste batteries annually. The process enables the recovery of lithium carbonate, graphite, and nickel-cobalt mixtures from spent batteries for reuse as battery raw materials. The plant is expected to recycle resources equivalent to batteries from approximately 6,000 electric vehicles per year, reducing reliance on landfill disposal.
3 hours ago