[SMM PV News] Kyocera and Cosmo Energy Sign Reciprocal Solar-Wind PPAs

Published: Mar 30, 2026 17:43
Japanese electronics maker Kyocera has entered into reciprocal power purchase agreements ('PPAs') with Cosmo Energy Holdings. Starting next month, Kyocera will supply solar power from its assets to Cosmo Energy Solutions. In exchange, Kyocera will procure electricity from the 48 MW Nakaki wind farm operated by Cosmo Eco Power. The partnership aims to diversify their renewable portfolios and explore future collaborations in battery storage. This move follows Kyocera's recent agreement with Osaki Electric and Taiwan Plastics Group to jointly develop an 'AI'-based energy management system integrating solar generation and lithium iron phosphate battery storage, targeting a final contract by the end of this year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Apr 3, 2026 17:53
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Read More
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
[SMM PV News] Puerto Rico Rooftop Solar Hits 20% of Total Power Capacity
Recent 'EIA' data shows rooftop solar now makes up 20% of Puerto Rico's power capacity (1,456 MW), surpassing natural gas as the second-largest source. Between 2016 and 2025, distributed solar accounted for 81% of all new capacity. To combat frequent grid outages, residents have deployed over 171,000 battery systems (2,864 MWh), with many joining grid operator LUMA's virtual power plant ('VPP') program. Despite this progress, new legislation extended the territory's sole coal plant to 2032 and removed interim renewable targets, though the 100% goal for 2050 remains.
Apr 3, 2026 17:53
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Apr 3, 2026 17:01
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Apr 3, 2026 09:59
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
Read More
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
[SMM PV News] US Solar Faces Labor Shortage Ahead of 'OBBBA' Deadline
The US solar industry faces a 53,000-worker shortfall as developers rush to meet the July 2026 construction deadline under the 'OBBBA'. Projections indicate 355,000 workers are needed to hit the 60-70 GW installation targets, yet 86% of employers report hiring difficulties. The labor crunch is compounded by a mandate requiring 15% of labor hours to come from apprentices to secure tax credits. To adapt, developers are building internal training pipelines, targeting veterans, and utilizing digital tools to maximize efficiency.
Apr 3, 2026 09:59