Chengdu Xinyan Delivered 48 49-mt Hydrogen Heavy Trucks

Published: Mar 18, 2026 13:47

Recently, Chengdu Xinyan Hydrogen Energy Technology Co., Ltd. completed the batch delivery of 48 hydrogen-powered heavy-duty trucks in the 49-mt class, marking not only a major breakthrough in the market-oriented deployment of the enterprise’s hydrogen-powered commercial vehicles, but also demonstrating its strength in large-scale operations and further accelerating Chengdu’s hydrogen energy industry toward commercialization and clustering.

The delivered vehicles were manufactured by Sinotruk Chengshang and equipped with the large-power hydrogen fuel cell system independently developed by Chengdu Xinyan. With high reliability and strong load-bearing capacity, they are well suited to trunk logistics and bulk transportation scenarios. Combined with local hydrogen refueling network support and Sichuan’s expressway toll reduction and exemption policies, they can provide clients with a green, efficient, and low-cost transportation solution.

As a core period of the “Chengdu-Chongqing Hydrogen Corridor,” Chengdu is accelerating the development of an ecological system spanning the entire industry chain of “production, storage, transportation, refueling, and application.” Multiple provincial- and municipal-level policies are supporting the promotion of hydrogen-powered vehicles. The operation of these heavy-duty trucks will further drive coordinated development across the upstream and downstream industry chain and foster a virtuous industrial cycle. As hydrogen energy has become a hot topic at this year’s national Two Sessions, with the industry focusing on the large-scale application of fuel cell vehicles, Chengdu Xinyan’s delivery responds to the national strategy with concrete action, supports Chengdu in building a highland for the hydrogen energy industry in western China, and injects new momentum into the region’s green transformation.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM New Energy] Zhejiang Unveils 2026 "1,000 Projects, 10 Trillion Yuan" List: Energy Storage Takes Center Stage
4 mins ago
[SMM New Energy] Zhejiang Unveils 2026 "1,000 Projects, 10 Trillion Yuan" List: Energy Storage Takes Center Stage
Read More
[SMM New Energy] Zhejiang Unveils 2026 "1,000 Projects, 10 Trillion Yuan" List: Energy Storage Takes Center Stage
[SMM New Energy] Zhejiang Unveils 2026 "1,000 Projects, 10 Trillion Yuan" List: Energy Storage Takes Center Stage
The Zhejiang Provincial Development and Reform Commission has released the first batch of major construction projects under the 2026 "1,000 Projects, 10 Trillion Yuan" Investment Plan. Within this prestigious provincial list, the energy storage sector is a major highlight, with 29 related projects selected. The scope of these projects spans the entire industrial chain—ranging from utility-scale energy storage stations to battery cell manufacturing, raw material production, and system integration. This strategic focus underscores Zhejiang's commitment to establishing a comprehensive and competitive energy storage ecosystem.
4 mins ago
Contract For 3,000 Tons Of Lithium Carbonate Terminated
17 hours ago
Contract For 3,000 Tons Of Lithium Carbonate Terminated
Read More
Contract For 3,000 Tons Of Lithium Carbonate Terminated
Contract For 3,000 Tons Of Lithium Carbonate Terminated
On March 16, 2026, Xi'an Lanshen New Material Technology Co., Ltd. announced the formal termination of the "Sales Contract for a 3,000 Tons/Year Battery-Grade Lithium Carbonate Extraction Plant" signed with HANACOLLA S.A. from Argentina. The core reason for this contract termination was a change in the overall project planning. Given that the "Sales Contract" was still within its validity period and partially fulfilled, the two parties reached an agreement after friendly negotiations. According to the signed "Termination Agreement," the original sales contract will be terminated from the date of the agreement's signing.
17 hours ago
CATL Jinchui Battery Base Nearing Delivery
17 hours ago
CATL Jinchui Battery Base Nearing Delivery
Read More
CATL Jinchui Battery Base Nearing Delivery
CATL Jinchui Battery Base Nearing Delivery
Recently, the CATL New Energy Battery Base Project (Jinchui Phase I) located in Badu Town, Jiaocheng District, Ningde City, Fujian Province, is scheduled to complete delivery by the end of April 2026. Jinchui Phase I involves a total investment of approximately 2 billion yuan, covering about 900 mu of land. It plans to construct approximately 370,000 square meters of new energy battery intelligent manufacturing standard factories and supporting auxiliary facilities. Upon completion, it will become an important production base for CATL in Jiaocheng District. CATL disclosed that its production capacity reached 772 GWh in 2025, with 321 GWh under construction.
17 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here