Tender Announcement for the New PV Power Station Project in Shibize Village, Dianshi Town, Hengshan District, Yulin City, Shaanxi Province

Опубликовано: Dec 18, 2024 09:42
[Shaanxi Yulin City Hengshan District Dianshi Town Shibize Village New PV Power Station Project Tender Announcement] Recently, the Shaanxi Provincial Public Resource Trading Center on the National Public Resource Trading Platform released a competitive consultation announcement for the new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City. The project tender scope mainly includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the city's second batch of consolidation funds. (Polaris Solar PV Network)

Recently, the National Public Resource Trading Platform Shaanxi Province Public Resource Trading Center issued a competitive consultation announcement for the new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City. The project bidding scope mainly includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the second batch of municipal-level consolidation funds.

Details are as follows:

Competitive Consultation Announcement for the New PV Power Station Project in Shibize Village, Dianshi Town, Hengshan District, Yulin City

I. Bidding Conditions

The new PV power station project in Shibize Village, Dianshi Town, Hengshan District, Yulin City has met the bidding conditions. The bidder is the Agriculture and Rural Affairs Bureau of Hengshan District, Yulin City, and the construction funds are sourced from fiscal funds, which have been secured. The bidding method is competitive consultation.

II. Project Overview and Bidding Scope

Project Overview: The main content includes the construction of a new 700KW PV power station. The maximum contract price for the project is 2.4156 million yuan, with funding sourced from the second batch of municipal-level consolidation funds.

Contract Division: Divided into one contract section.

III. Applicant Qualification Requirements

1. Qualification Requirements: Applicants must possess a Grade III or above general contracting qualification for power engineering construction issued by the construction administrative authority and have corresponding performance capabilities in terms of personnel, equipment, and funds. They must be independent legal entities legally registered and established in China during their operating period, holding a valid business license with a unified social credit code.

2. Project Manager: The proposed project manager must hold a second-level or above registered constructor qualification in mechanical and electrical engineering, possess a valid safety production assessment certificate (Certificate B), and not serve as the project manager for any other ongoing projects.

3. Safety Production Permit: Bidders must hold a valid safety production permit.

4. Financial Requirements: Provide financial audit reports for the past three years issued by an accounting firm or audit institution (financial audit reports for 2021-2023, three in total). Companies established for less than three years must provide financial audit reports from the year of establishment to the present. Companies newly established in 2024 must provide a bank credit certificate.

5. Credit Requirements: The basic information of the applicant and the proposed project manager must be searchable on the "Shaanxi Provincial Department of Housing and Urban-Rural Development" website. Applicants with any of the following circumstances are not eligible to bid (items 1-3 require a commitment letter, item 4 requires a credit report and website query screenshot).

(1) Ordered to cease operations;

(2) Assets under custody or frozen;

(3) Disqualified from bidding due to penalties imposed by relevant administrative enforcement authorities (blacklist);

(4) Listed as a seriously dishonest entity on Credit China (.cn/xinyongfuwu/shixinheimingdan/) or having bribery criminal records on the China Judgments Online (http://wenshu.court.gov.cn/) (executed persons include contractors, legal representatives, and project managers). The credit report download time must be within the period from the issuance of the competitive consultation documents to the consultation deadline.

IV. Acquisition of Competitive Consultation Documents

Acquisition Time: From 9:00 AM on December 18, 2024, to 5:00 PM on December 24, 2024.

Acquisition Method: Applicants participating in this project consultation must register on the Shaanxi Province Public Resource Trading Center platform and confirm their bid for this project before the registration deadline (excluding weekends and statutory holidays). They must bring the bid confirmation receipt, company introduction letter, authorization letter (or legal representative identification), a copy of the qualification certificate stamped with the company seal, and the original and a copy of the applicant's ID card (stamped with the company seal) to the second floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yulin City, Shaanxi Province, to obtain the consultation documents.

V. Submission of Consultation Response Documents

Submission Deadline (Bid Deadline, the same hereinafter): 3:00 PM on December 30, 2024.

Submission Method: Paper documents must be submitted to the multifunctional conference room on the third floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yuyang District, Yulin City, Shaanxi Province.

VI. Consultation Time and Location

Consultation Time: 3:00 PM on December 30, 2024.

Consultation Location: Multifunctional conference room on the third floor of Zhongcai Keda, opposite the Construction Bureau on Hangyu Road, Yuyang District, Yulin City, Shaanxi Province.

VII. Others:

7.1 Bidding Method: Competitive consultation.

7.2 Construction Location: Shibize Village, Dianshi Town, Hengshan District, Yulin City.

7.3 Construction Period: 150 calendar days.

7.4 Bidding Scope: The main content includes the construction of a new 700KW PV power station.

7.5 Announcement Media:

This bidding announcement is published on the "Shaanxi Province Public Resource Trading Platform" and the "Shaanxi Procurement and Bidding Network."

7.6 Other Requirements:

(1) Applicants with the same person in charge or with controlling or management relationships between different entities are not allowed to participate in the same project.

(2) CA Lock Purchase: ① On-site purchase at Yulin City Civic Center, 3rd Floor, Windows E18 and E19, Phone: 0912-3452148. Bid confirmation procedure: Log in to the National Public Resource Trading Center Platform (Shaanxi Province) (/), select "Electronic Trading Platform - Shaanxi Government Procurement Trading System - Enterprise End" to log in, and after logging in, select the "Transaction Party B" identity to enter the applicant interface for bid confirmation.

VIII. Supervisory Authority

This project is supervised by the Development and Reform and Science and Technology Bureau of Hengshan District, Yulin City.

IX. Contact Information (Same as Objection Contact Information)

Bidder: Agriculture and Rural Affairs Bureau of Hengshan District, Yulin City.

Address: Room 807, 8th Floor West, No. 9 Beida Street, Hengshan District, Yulin City, Shaanxi Province.

 

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
[Солнечная энергия: Нью-Джерси принимает закон о балконных солнечных установках]
2 часов назад
[Солнечная энергия: Нью-Джерси принимает закон о балконных солнечных установках]
Читать далее
[Солнечная энергия: Нью-Джерси принимает закон о балконных солнечных установках]
[Солнечная энергия: Нью-Джерси принимает закон о балконных солнечных установках]
Нью-Джерси принял Закон о балконной солнечной энергетике Garden State, став девятым штатом США, который прямо разрешает подключаемые солнечные системы. Согласно закону, подключаемые солнечные устройства могут подключаться к существующей электрической системе дома через стандартную розетку 120 В. Потребители могут использовать портативные солнечные устройства с суммарной мощностью до 1200 Вт без соглашения о межсетевом соединении, а системы мощностью 400 Вт или менее освобождаются от требований по изменению электропроводки здания или электрических щитов, хотя они по-прежнему должны соответствовать стандартам безопасности. Закон также запрещает арендодателям, товариществам собственников жилья и муниципалитетам запрещать такие системы или требовать разрешения на их использование. Закон вступит в силу 1 марта 2027 года.
2 часов назад
[Solar: В августе солнечная энергетика в Португалии достигла новых максимумов выработки электроэнергии]
2 часов назад
[Solar: В августе солнечная энергетика в Португалии достигла новых максимумов выработки электроэнергии]
Читать далее
[Solar: В августе солнечная энергетика в Португалии достигла новых максимумов выработки электроэнергии]
[Solar: В августе солнечная энергетика в Португалии достигла новых максимумов выработки электроэнергии]
Выработка солнечной энергии в Португалии достигла рекордного пика около 3,85 ГВт в августе благодаря продолжающемуся росту мощностей: с декабря 2025 года по май 2026 года было добавлено 372 МВт солнечных мощностей, в результате чего совокупная мощность достигла примерно 7,3 ГВт. Солнечная фотоэлектрическая энергия впервые стала крупнейшим источником выработки электроэнергии в Португалии в июле, покрыв 19% национального потребления, опередив гидроэнергетику с 16% и ветроэнергетику с 13%, при этом возобновляемые источники обеспечили 52% потребления в августе. За первые восемь месяцев года возобновляемые источники покрыли 66% потребления электроэнергии в Португалии: гидроэнергетика — 25%, ветроэнергетика — 23%, солнечная энергия — 13%. Чистый импорт электроэнергии также достиг нового пика выше 5,2 ГВт после усиления пропускной способности соединений с Испанией.
2 часов назад
[Solar: Сенат Бразилии одобрил налоговый режим для дата-центров, увязывающий льготы с использованием возобновляемой энергии]
2 часов назад
[Solar: Сенат Бразилии одобрил налоговый режим для дата-центров, увязывающий льготы с использованием возобновляемой энергии]
Читать далее
[Solar: Сенат Бразилии одобрил налоговый режим для дата-центров, увязывающий льготы с использованием возобновляемой энергии]
[Solar: Сенат Бразилии одобрил налоговый режим для дата-центров, увязывающий льготы с использованием возобновляемой энергии]
Федеральный сенат Бразилии одобрил законопроект 278/2026, учреждающий специальный налоговый режим Redata для дата-центров и приостанавливающий на пять лет взимание импортных пошлин, а также федеральных налогов IPI и PIS/Cofins на оборудование и компоненты. Среди условий получения льгот — дата-центры должны полностью покрывать весь законтрактованный спрос на электроэнергию за счёт договоров поставки или собственной генерации с использованием возобновляемых либо низкоэмиссионных источников. В 2021–2024 годах было подписано 11 долгосрочных контрактов на поставку возобновляемой энергии между генераторами и дата-центрами общей мощностью 330 МВт на сумму около 7,7 млрд бразильских реалов (1,4 млрд долларов), и ожидается, что новый режим дополнительно увеличит спрос на солнечные и ветровые проекты и PPA по мере роста рынка дата-центров в Бразилии. Теперь законопроект направляется президенту для санкционирования
2 часов назад