On August 9, the bid announcement for the storage system procurement (with separation of evaluation and award) of the 200MW/400MWh shared energy storage demonstration project of Guyuan Changli Integrated Energy Service Co., Ltd. was released. The project tenderer is Changxia Electric Power Engineering (Anhui) Co., Ltd., and the project is located in Yuanzhou District, Guyuan City, Ningxia.
Results of bid evaluation (audit) (without ranking the bid award candidates):
Name of bid award candidate: BYD Auto Industry Co., Ltd.
Name of bid award candidate: Envision Energy Co., Ltd.
Name of bid award candidate: Beijing Hyperstar Technology Co., Ltd.

![Искусственный графит стабилен в ожидании роста цен, природный графит остаётся вялым [Еженедельный обзор рынка сырья для анодов литий-ионных аккумуляторов SMM]](https://imgqn.smm.cn/usercenter/oVqJl20251217171730.jpg)
![Цены на электролит выросли на этой неделе (31.08.2026–03.09.2026) [Еженедельный обзор рынка электролита для литиевых батарей SMM]](https://imgqn.smm.cn/usercenter/HySQT20251217171731.png)
