On November 24th, the new Inner Mongolia Energy Solar Power EPC project, built by China Energy Construction Anhui Electric Construction Second Company, was fully connected to the grid and started generating electricity.
The project is located in the Shanghaimiao Town of Etokeqianqi, Inner Mongolia Autonomous Region, and covers an area of 511 acres with a total installed capacity of 20.1 megawatts. It adopts a new industrial model of "coal mining subsidence area + photovoltaic desert control", using "power generation on the board, planting under the board, and sand control" to create a green ecological mining area.
After completion, the project will revitalize the idle land in the coal mining subsidence area, drive the restoration of desertified land in the mining area, and play an important role in promoting the coordinated development of local energy development and ecological environment.
![[Новости SMM PV] На высоте 4700 метров! Крупнейший фотоэлектрический проект в среднем и нижнем течении реки Ярлунг-Цангпо в Тибете завершён.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Новости солнечной энергетики] Министерство энергетики США (DOE) инвестирует 12 миллионов долларов в разработку космических фотоэлектрических технологий](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[Новости SMM PV] Создание европейского эталона | Проект трекерной системы Chiko Solar Energy мощностью 221 МВт в Италии официально запущен](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
