Exclusive: China's refined zinc output rose 5.44% on the month to 496,900 mt in March

Published: Apr 8, 2021 09:25
China's refined zinc output stood at 496,900 mt in March, up 5.44% or 25,600 mt on the month and up 6.49% on the year.

SHANGHAI, Apr 8 (SMM) – China's refined zinc output stood at 496,900 mt in March, up 5.44% or 25,600 mt on the month and up 6.49% on the year. Output stood at 1.51 million mt in January-March, up 4.3% year on year. Smelters in the survey sample produced 75,100 mt of zinc alloy in March, up 5% from the previous month. Output of primary zinc stood at 390,000 mt in March, and secondary zinc output came in at 40,000 mt.

SMM survey showed the recovery of domestic refined zinc supply in March was less than expectations. The main reason was that the impact of "dual energy consumption control" in Inner Mongolia spread to the refined zinc industry. Many refined zinc smelters in Inner Mongolia controlled production and reduced energy consumption for the month. In addition, the supply of domestic zinc ore was still tight, and TCs for domestic zinc ore were low, which led to production losses in some smelters. Therefore, they continued to reduce planned output in March and the final reduction was due to the regular maintenance of the refinery.

SMM expects domestic refined zinc output to rise 6,500 mt month on month to 503,400 in April. The overall recovery is still not as good as expectations. The main reason was that the environmental protection inspection team in Hunan Province settled in, and the secondary zinc enterprises in some areas reduced and suspended production in response. In addition, the regular maintenance of some refineries in Yunnan and Xinjiang in April further led to a month-on-month decline in domestic refined zinc production.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
19 hours ago
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
Read More
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
On April 30th, South32 raised the development cost estimate for the Taylor deposit at its Hermosa zinc-silver project in Arizona, US, and delayed the timeline. First-stage capital expenditure has increased by more than 50%, from $2.2 billion in the 2024 FS to $3.3 billion. First production has been delayed by one year to H2 FY2028, full production has also been pushed back to FY2031. Cost increase was mainly due to contractor underperformance, slower-than-expected construction productivity, scope changes, inflation, US tariffs and higher input costs. Progress on a key ventilation shaft is the main bottleneck now. But the company also noted that ore reserves at Taylor increased by 52%, mineral resources rose by 10%, extending the expected mine life from 28 years to around 33 years.
19 hours ago
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Apr 30, 2026 19:11
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Read More
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
[Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs] Overall, refined zinc production release in April and May fell short of expectations, mainly because as ex-China mine disruptions increased and China's ore recovery remained limited, TCs accelerated downward. Imported TCs have already dropped to $39.25/dmt, while China's weekly TCs broke below historical lows to 850 yuan/mt in metal content...
Apr 30, 2026 19:11
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Apr 30, 2026 17:15
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Read More
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
[Tibet Huayu 2025 Annual Report Released] On April 29, Tibet Huayu released its 2025 annual report. In 2025, the company completed zinc concentrates production of 21,300 mt in metal content, up 9.07% YoY, lead-antimony concentrates with silver content production of 19,000 mt in metal content, up 14.56% YoY, and gold concentrates of 1,002 kg, down 46.66% YoY.
Apr 30, 2026 17:15