Iron ore arrivals at Chinese ports continued to edge lower on week

Опубликовано: Jul 14, 2020 14:19
A total of 91 vessels carrying 15.44 million mt of iron ore arrived at eight major Chinese ports during July 5-11, SMM estimates. This was down 350,000 mt from the prior week and down 2.08 million mt from the previous year.

SHANGHAI, Jul 14 (SMM) – A total of 91 vessels carrying 15.44 million mt of iron ore arrived at eight major Chinese ports during July 5-11, SMM estimates. This was down 350,000 mt from the prior week and down 2.08 million mt from the previous year. 


The amount of arrivals in China’s top steelmaking city of Tangshan continued to rise, on the back of higher demand from steel mills and increased purchases by traders, with arrivals at two ports in Tangshan both exceeding 3 million mt. 


For the same week, iron ore deliveries leaving Australian ports fell 1.63 million mt on the week to 15.93 million mt. That was 1.75 million mt higher as compared with the same period last year. Maintenance at the Port Hedland and Port Walcott in early-July accounted for the decline in shipments from a week ago, but the proportion of Australian iron ore destined for China rebounded on the week. 


Shipments that departed Brazilian ports were estimated to dip 680,000 mt from the prior week to 6.22 million mt, also due to maintenance at some ports. The reading was about 530,000 mt higher than the level of the same period last year.


Smaller arrivals at Chinese ports and reduced shipments from Australia and Brazil last week remain supportive of the iron ore market. 

 

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
11 Sep 2026 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Читать далее
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
11 Sep 2026 18:30
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
7 Sep 2026 15:43
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Читать далее
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения производства медных катодов мощностью 300 000 тонн в год компании JCC Hongyuan Copper, дочерней структуры Jiangxi Copper Corporation, 4 сентября перешёл на стадию предварительного утверждения и публичного уведомления в рамках оценки воздействия на окружающую среду. Общий объём инвестиций составляет около 1,416 млрд юаней. Начало строительства запланировано на сентябрь 2026 года, завершение — на декабрь 2027 года. После завершения проекта общая мощность JCC Hongyuan вырастет с 250 000 до 550 000 тонн.
7 Sep 2026 15:43
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
3 Sep 2026 19:00
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Читать далее
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
[SMM Экспресс по драгоценным металлам] В ходе торгов в среду японская иена резко укрепилась, пара USD/JPY опустилась ниже 159 и закрылась снижением на 0,92% на отметке 158,69, что вызвало предположения о валютной интервенции Японии. Индекс доллара также резко упал, а ослабление доллара оказало поддержку драгоценным металлам.
3 Sep 2026 19:00