Steel supply pressure from capacity replacement in China to take hold in 2021

Опубликовано: May 18, 2020 16:20
China’s iron and steel sector is unlikely to substantially feel the supply pressure stemming from concentrated capacity replacement until next year, as most of the projects will not come online until the end of this year, SMM expects.

SHANGHAI, May 18 (SMM) – China’s iron and steel sector is unlikely to substantially feel the supply pressure stemming from concentrated capacity replacement until next year, as most of the projects will not come online until the end of this year, SMM expects.

 

The second half of 2020, an anticipated peak year for steel capacity replacement in China, is expected to see 83% of new iron-making capacity for the full year, 79.3% of converter steel-making capacity and 81.6% of electric furnace steel-making capacity for the year coming on stream. Supply pressure from those new capacity, however, is unlikely to take hold until next year, as the commissioning of most of those facilities is in December.

 

China’s iron-making capacity to shrink 320,000 mt/year in 2020

 

A total of 38 blast furnaces, with combined iron-making capacity of 57.54 million mt on an annualised basis, are expected to come online in China this year, with 47.76 million mt, or 83%, in H2, according to data compiled and calculated by SMM.

 

By region, 52.2% of the new capacity for this year is in north China, 19.4% is in the east and 13.1% is in the south, while the top steelmaking province of Hebei is the home to 77.5% of north China’s new capacity.

 

China’s new iron-making capacity coming online in H2 is estimated to require 81.19 million mt of iron ore per annum, and the majority of those raw materials will be sourced from abroad, as the proportion of foreign ore usage to total iron ore usage at those projects ranges 50%-100%, or averages 80%.

 

For the full year of 2020, 57.86 million mt of blast furnace capacity will go offline, indicating a net reduction of 320,000 mt.

 

Table 1: China’s new iron-making capacity anticipated in H2 2020   

Source: SMM

 

Steel-making capacity to decline 5.8 million mt/year this year

 

This year, converters coming online in China are estimated to reach 47.57 million mt on an annualised basis, with 37.7 million mt, or 79.3% in H2, while those going offline will total 57.86 million mt, with 50.41 million mt in H2. That implies a net decline of 10.29 million mt for the year.

 

EF steel-making capacity in the country, however, is expected to see a net increase of 4.49 million mt for 2020, boosting annual steel scrap consumption by 2.81 million mt.

 

A total of 26 EF lines will be put into operation this year, translating to 22.92 million mt of steelmaking capacity, while 18.43 million mt will come offline. About 81.6%, or 18.71 million mt of new EF capacity for the year will not come online until H2.     

 

Table 2: China’s new steel-making capacity anticipated in H2 2020  

Source: SMM

 

Guangxi Liuzhou to commission 7.5 million mt/year of bar capacity in August

 

Guangxi Liuzhou Iron and Steel plans to put 7.5 million mt on an annualised basis of rebar and high-speed wire rod into operation in August, which will exert downward pressure on long steel prices in China.

 

Rolling capacity in China is expected to grow at least 25.2 million mt this year, as the country’s industry ministry did not put a brake on the expansion of such capacity.

 

Most of the facilities will not come online until December, which will have limited impact on the market in H2.

 

Table 3: China’s new rolling capacity anticipated in H2 2020

Source: SMM

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
11 Sep 2026 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Читать далее
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
11 Sep 2026 18:30
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
7 Sep 2026 15:43
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Читать далее
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения производства медных катодов мощностью 300 000 тонн в год компании JCC Hongyuan Copper, дочерней структуры Jiangxi Copper Corporation, 4 сентября перешёл на стадию предварительного утверждения и публичного уведомления в рамках оценки воздействия на окружающую среду. Общий объём инвестиций составляет около 1,416 млрд юаней. Начало строительства запланировано на сентябрь 2026 года, завершение — на декабрь 2027 года. После завершения проекта общая мощность JCC Hongyuan вырастет с 250 000 до 550 000 тонн.
7 Sep 2026 15:43
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
3 Sep 2026 19:00
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Читать далее
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
[SMM Экспресс по драгоценным металлам] В ходе торгов в среду японская иена резко укрепилась, пара USD/JPY опустилась ниже 159 и закрылась снижением на 0,92% на отметке 158,69, что вызвало предположения о валютной интервенции Японии. Индекс доллара также резко упал, а ослабление доллара оказало поддержку драгоценным металлам.
3 Sep 2026 19:00