Safety checks likely to intensify after iron ore blast in Liaoning

Опубликовано: Jun 6, 2018 11:22
Safety inspections at medium-sized and small mines are likely to be intensified following the blast at an iron ore mine in Liaoning province

SHANGHAI, Jun 6 (SMM) – Safety inspections at medium-sized and small mines are likely to be intensified following the blast at an iron ore mine in Liaoning province, SMM believes.

The blast occurred on Tuesday June 5, when miners dropped explosives down the mine shaft. The death toll stood at 11 people, nine were injured and 25 were trapped in the mine. As of 7:00 am Wednesday June 6, 23 of the 25 trapped people have been rescued.

The mine, at Sishanling Fe deposit in Nanfen district of Benxi city, has the largest iron ore deposit in Asia.

The mine has yet to be commissioned. In 2019, the first stage is expected to be commissioned with annual capacity of 15 million mt of iron ore and 5.31 million mt of iron concentrate. After its second stage is commissioned, annual capacity is expected to reach 30 million mt of ore and over 10 million mt of iron concentrate.

Annual capacity of iron concentrate across state-run mines in Benxi stands at 12-13 million mt. Mines in Benxi have not received any notice after the accident, SMM learned.


For editorial queries, please contact Daisy Tseng at daisy@smm.cn 
For more information on how to access our research reports, please email service.en@smm.cn

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
11 Sep 2026 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Читать далее
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
11 Sep 2026 18:30
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
7 Sep 2026 15:43
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Читать далее
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения JCC Hongyuan Copper стоимостью 200 млн долларов нацелен на увеличение мощности до 550 000 тонн к 2027 году
Проект расширения производства медных катодов мощностью 300 000 тонн в год компании JCC Hongyuan Copper, дочерней структуры Jiangxi Copper Corporation, 4 сентября перешёл на стадию предварительного утверждения и публичного уведомления в рамках оценки воздействия на окружающую среду. Общий объём инвестиций составляет около 1,416 млрд юаней. Начало строительства запланировано на сентябрь 2026 года, завершение — на декабрь 2027 года. После завершения проекта общая мощность JCC Hongyuan вырастет с 250 000 до 550 000 тонн.
7 Sep 2026 15:43
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
3 Sep 2026 19:00
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Читать далее
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
Японская иена укрепляется: USD/JPY опустилась ниже 159 на фоне спекуляций об интервенции
[SMM Экспресс по драгоценным металлам] В ходе торгов в среду японская иена резко укрепилась, пара USD/JPY опустилась ниже 159 и закрылась снижением на 0,92% на отметке 158,69, что вызвало предположения о валютной интервенции Японии. Индекс доллара также резко упал, а ослабление доллара оказало поддержку драгоценным металлам.
3 Sep 2026 19:00