Hebei to Eliminate Steel&Iron Capacities in Langfang by Late 2019; Output Restriction in Heating Season Releases

Published: Aug 4, 2017 13:12
Langfang will cut 4.12 million tonnes of iron capacity and 1.7 million tonnes of steel capacity at 4 steel mills in 2017, and Tangshan will restrict 50% of steel capacity in heating season in winter.

SHANGHAI, Sep. 4 (SMM) – Langfang will cut 4.12 million tonnes of iron capacity and 1.7 million tonnes of steel capacity at 4 steel mills in 2017, and will clamp down all capacities at those 4 steel mills by late 2019.

Tangshan to Clamp Down All Gasoline and Diesel Trucks at Ports by September for Environmental Protection

In other news, Tangshan will restrict 50% of steel capacity in heating season in winter days, in terms of blast furnace capacity, which will be verified by real power consumption. Output at coking plants should be restricted by 30%.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
May 19, 2026 17:28
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Read More
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
[Secondary Lead Enterprise Updates] It was reported that the 200,000 mt lead-acid battery environmental protection utilization project of Dongying Xinsanyuan Environmental Protection Technology Co., Ltd. was under orderly construction and progressing on schedule, and was expected to be completed and put into operation before the end of 2026. As a key project in Dongying City, Shandong Province, the project had a total investment of 480 million yuan, covering an area of 103 mu. Once completed, it will fill the regional gap in the harmless treatment and resource utilization of waste lead-acid batteries, injecting new momentum into regional green circular development.
May 19, 2026 17:28
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
May 15, 2026 15:24
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Read More
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
[SMM Lead Market News] It was learned that since April, affected by environmental protection rectification and extended shipping cycles, lead smelters in Southeast Asia have experienced production cuts and shutdowns. Lead ingot supply has gradually tightened, spot premiums have risen, and high-grade lead ingots have even become difficult to source. Currently, the SMM Malaysia lead ingot 99.99-99.995% CIF premium was quoted at $150-170/mt, with a few suppliers once again making exploratory offers at a premium of $200/mt, though no transactions have been concluded at this price.
May 15, 2026 15:24
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
May 9, 2026 20:23
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Read More
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
Zhangye Establishes Waste Lead-Acid Battery Collection Entity with 2,000 mt/year Capacity
[Waste Lead-Acid Battery Market Dynamics] It was reported that one waste lead-acid battery collection and storage entity has been established in Zhangye City, Gansu Province, namely Zhangye Mingcheng Waste Battery Recycling Co., Ltd., which has obtained the Hazardous Waste Operating License issued by the Department of Ecology and Environment of Gansu Province. The approved operating method and category is the collection (HW31, 900-52) of waste lead-acid batteries, with an operating capacity of 2,000 mt/year. A total of 4 waste lead-acid battery collection sites have been set up across the city.
May 9, 2026 20:23