Scrap demand among Taiwanese steel mills may drop in May

Published: May 20, 2015 15:26
The demand for scrap from Taiwanese steel mills is likely to drop during May, according to The Steel Index.

 

TAIWAN May 20 2015 10:50 AM
TAIPEI (Scrap Register): The demand for scrap from Taiwanese steel mills is likely to drop during May, according to The Steel Index.
 
This is as a consequence of restrictions on electricity usage kicking in, along with the fact that local demand for finished products remains weak. 
 
Mills are unable to push up the price of long products in the domestic market and, thus, they can only tolerate lower prices when bidding for imported scrap. 
 
For Live Chinese Scrap Prices Log on to Scrap Register
 
The market outlook for long steel products in Taiwan remains very negative as participants perceive no way for demand to increase in the near future. 
 
However, the monthly average for Taiwanese scrap imports of HMS #1&2 80:20 fell by $2.40 a ton month-on-month during April to $230 ton CFR Taiwanese port.
 
Prices of imported ISRI grade scrap have now dropped below $230 a ton and most believe that, in order for mills to survive, scrap prices need to remain suppressed.
 
(This article is compiled by Vibin Antony on behalf of Scrap Register. Send in your suggestions and comments to editor@scrapregister.com)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Hanrui Cobalt Invests in Ganzhou Nickel Project for Battery-Grade Sulphate Production
5 mins ago
Hanrui Cobalt Invests in Ganzhou Nickel Project for Battery-Grade Sulphate Production
Read More
Hanrui Cobalt Invests in Ganzhou Nickel Project for Battery-Grade Sulphate Production
Hanrui Cobalt Invests in Ganzhou Nickel Project for Battery-Grade Sulphate Production
[Hanrui Cobalt Announces Investment in Annual Output of 40,000 mt Electrodeposited Nickel and 40,000 mt (Metal Content) Battery-Grade Nickel Sulphate Project] Hanrui Cobalt announced that to further meet the company's business development needs and promote the implementation of its strategic planning, Nanjing Hanrui Cobalt Co., Ltd. (hereinafter referred to as the "Company") plans to invest in and construct the "Annual Output of 40,000 mt Electrodeposited Nickel and 40,000 mt (Metal Content) Battery-Grade Nickel Sulphate Project" in Ganzhou City, Jiangxi Province, through its wholly-owned subsidiary Ganzhou Hanrui New Energy Technology Co., Ltd. (hereinafter referred to as "Ganzhou Hanrui"). The total investment of the project is 2,002.5278 million yuan, with funds sourced from the Company's own capital or self-raised funds.
5 mins ago
[SMM Analysis] Indonesian Ore Prices Under Downward Pressure, Persistently Low Grade Restricts Supply Quality
9 hours ago
[SMM Analysis] Indonesian Ore Prices Under Downward Pressure, Persistently Low Grade Restricts Supply Quality
Read More
[SMM Analysis] Indonesian Ore Prices Under Downward Pressure, Persistently Low Grade Restricts Supply Quality
[SMM Analysis] Indonesian Ore Prices Under Downward Pressure, Persistently Low Grade Restricts Supply Quality
9 hours ago
[SMM Nickel Market Flash] Indonesia RKEF Utilisation Drops to 76% on Ore Quota Cut; Govt Eyes $18-20K Nickel Range
20 hours ago
[SMM Nickel Market Flash] Indonesia RKEF Utilisation Drops to 76% on Ore Quota Cut; Govt Eyes $18-20K Nickel Range
Read More
[SMM Nickel Market Flash] Indonesia RKEF Utilisation Drops to 76% on Ore Quota Cut; Govt Eyes $18-20K Nickel Range
[SMM Nickel Market Flash] Indonesia RKEF Utilisation Drops to 76% on Ore Quota Cut; Govt Eyes $18-20K Nickel Range
Indonesia's RKEF smelter capacity utilisation has fallen to 76% from 84% in 2025 after the energy ministry cut the 2026 nickel ore quota to 260–270 million tonnes — below last year's 320 million tonnes output and FINI's demand estimate of 340–350 million tonnes. FINI chairman Arif Perdana Kusuma said several lines in South and Central Sulawesi are running below 50% capacity; smelters are holding minimal output rather than cold-shutting furnaces, which would take months to restart. A member of Indonesia's National Economic Council said the quota was needed to prevent a record surplus, and pointed to $18,000–$20,000/t as the government's target price corridor — cautioning that a significant overshoot above $20,000 would harm nickel end-users.
20 hours ago