Veolia to Operate 350 MW Microgrid for AI Data Center in Ohio with 430 MWh Battery Storage
Veolia has been selected to operate and maintain a 350 MW microgrid powering an AI data center campus in New Albany, Ohio, which includes a 430 MWh battery energy storage system. The project highlights the convergence of AI-driven data center load growth and behind-the-meter / front-of-meter storage deployment. As hyperscalers seek reliable, low-carbon power for AI training and inference workloads, integrated microgrids with large-scale BESS are emerging as a preferred solution. Veolia’s selection as O&M provider reflects the growing need for specialized asset management expertise in complex hybrid systems. The project also illustrates how AIDC-related demand is becoming a tangible driver for U.S. storage deployment beyond traditional renewable pairing applications.