Mozal Aluminium Enters Care and Maintenance Due to Power Supply Issues

Published: Mar 16, 2026 09:11
According to South32’s official website on March 16, Mozal Aluminium (Mozal) was confirmed to have entered care and maintenance status on March 15, with annual capacity of approximately 580,000 mt. South32’s CEO said that over the past six years, the company had engaged extensively with the Mozambican government, Eskom, and other stakeholders, but failed to secure sufficient and affordable power supply for Mozal beyond March. This shutdown will incur a one-off cost of about $60 million, with subsequent annual maintenance expenses of around $5 million, and the alumina originally supplied to Mozal will be resold to third parties.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
40 mins ago
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
Read More
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
"SMM Aluminum: Guangxi Qiangqiang's 600,000 mt Anode Project Set for 2026 Trial Production"
[SMM Aluminum Flash News] The Guangxi Qiangqiang Carbon-Based New Materials prebaked anode project, with an annual capacity of 600,000 mt, officially commenced construction in April 2025 and is expected to begin trial production in July 2026. The first calcining furnace is estimated to start production by the end of March; the roasting furnace is expected to start production by the end of May, with the forming workshop producing the first green anode, marking the project’s full integration; and the first baked anode is expected to be produced by the end of July.
40 mins ago
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
49 mins ago
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
Read More
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
Alba Shuts Down 19% of Production Capacity to Optimize Raw Material Use and Ensure Stability
According to Alba’s official website on March 15, Alba has initiated a controlled and safe shutdown of Production Lines 1, 2, and 3, involving capacity equivalent to 19% of its total capacity of 1.623 million mt, with the aim of optimizing the utilization of Alba’s existing raw material inventory and prioritizing the operational stability of Production Lines 4, 5, and 6.
49 mins ago
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
1 hour ago
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
Read More
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
Indonesia and Japan Sign Cooperation on Critical Minerals and Nuclear Energy
[SMM Aluminum Express News] Indonesia's Minister of Energy and Mineral Resources (ESDM), Bahlil Lahadalia, held a bilateral meeting with Japan's Minister of Economy, Trade and Industry (METI), Ryosei Akazawa, on the sidelines of the Indo Pacific Energy Security Ministerial and Business Forum (IPEM) in Tokyo, Japan, March 15, 2026. A key outcome was the signing of a Memorandum of Cooperation in two strategic areas: 1. Critical minerals (focusing on secure, sustainable supply chains for nickel, bauxite, lithium, rare earths, and others essential for batteries, EVs, and green tech). 2. Nuclear energy (covering technology transfer, human resource development, safety standards, regulatory alignment, and potential collaboration on small modular reactors or other advanced nuclear solutions).
1 hour ago