Tender for the Procurement of Steel Strip for Welding Wire in March 2026 for Metallurgical Machinery

Published: Mar 11, 2026 14:00

1. Procurement Conditions

The procurement entity for this procurement project, Metallurgical Machinery March 2026 Steel Strip for Welding Wire Procurement (AGZYFZHGXHD260309272380), is Angang Group Zhongyuan Industrial Development Co., Ltd. The procurement project was funded by self-raised funds. The project had met the procurement conditions, and an open comparative inquiry was now conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: Metallurgical Machinery March 2026 Steel Strip for Welding Wire Procurement

2.2 Alternative Procurement Method in Case of Procurement Failure: Negotiation procurement

2.3 For the contents, scope, and scale of this project procurement, please refer to the attachment "Material List Attachment.pdf" for details.

3. Bidder Qualification Requirements

3.1 Joint bids were not permitted for this procurement.

3.2 This procurement required bidders to have the following qualification requirements:

(1) Manufacturing business license

(2) Distribution business license

3.3 This procurement required bidders to meet the following registered capital requirements:

Registered capital for manufacturers: 600,000 yuan and above

Registered capital for distributors: 600,000 yuan and above

3.4 This procurement required bidders to meet the following performance requirements:

See the attachment for details (if required)

3.5 This procurement required bidders to have the following capability requirements, financial requirements, and other requirements:

Financial requirements: See the attachment for details (if required)

Capability requirements: See the attachment for details (if required)

Other requirements: See the attachment for details (if required)

3.6 For projects that were legally required to undergo tender, bids submitted by dishonest persons subject to enforcement were invalid.

4. Acquisition of Procurement Documents

4.1 Any interested bidder shall, from 17:00 on March 09, 2026 to 08:00 on March 18, 2026 (Beijing time, the same hereinafter), log in to the Ansteel Smart Tender and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents.

Click to View Tender Details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05