On January 17, the winning candidates for the PV module procurement of the second phase 500,000 kW project of the 2 million kW PV ESS integrated project in Shule by Shenzhen Energy were announced. The first-ranked candidate is Risen Energy Co., Ltd., with a bid price of 4.5228937312 billion yuan; the second-ranked candidate is Anhui Guosheng New Energy Technology Co., Ltd., with a bid price of 4.1699511568 billion yuan; the third-ranked candidate is DAS Solar Co., Ltd., with a bid price of 4.52289470 billion yuan.

This tender is for the PV module procurement of the second phase 500,000 kW project of the 2 million kW PV ESS integrated project in Shule by Shenzhen Energy. The tendered equipment should be N-type TOPCon high-efficiency bifacial double-glass PV modules (with frames). The power of a single PV module should be 615 Wp or above, with a positive tolerance (0~5 W). The total bidding capacity is temporarily set at 653.59736 MW on the DC side.
![[Preços de módulos fotovoltaicos distribuídos continuam a divergir]](https://imgqn.smm.cn/usercenter/CaHKo20251217171738.jpg)
![[Produtores de primeira linha ainda negociam preços de vidro fotovoltaico]](https://imgqn.smm.cn/usercenter/AuVub20251217171738.jpg)
![[Solar: Bangladesh introduz tarifa de US$ 0,086/kWh para energia solar em telhados com medição líquida e meta de 5 GW]](https://imgqn.smm.cn/usercenter/zvkUO20251217171743.jpg)
