Module Price Reduction Stimulates Pick-Up; Battery Inventory Levels Rise [SMM Silicon-Based PV Morning Meeting Summary]

Publicado: Jan 16, 2025 08:27
[SMM Silicon-Based PV Morning Meeting Summary: Module Price Reduction Stimulates Cargo Pick-Up, Battery Inventory Levels Rise] In the current module market, the mainstream transaction prices for centralized projects are as follows: PERC 182mm (0.63-0.68 yuan/W), PERC 210mm (0.64-0.69 yuan/W), N-type 182mm (0.64-0.69 yuan/W), and N-type 210mm (0.65-0.7 yuan/W). The mainstream transaction price range remains stable. During the off-season, order volumes have significantly decreased, and some companies have reduced prices to stimulate cargo pick-up.

》View SMM Silicon Product Prices

》Order to View Historical Price Trends of SMM Metal Spot

》Click to View SMM Metal Industry Chain Database

SMM, January 16:

Solar Cell

Prices

High-efficiency PERC 182 solar cells (efficiency of 23.2% and above) are priced at 0.325-0.34 yuan/W; there is no transaction volume in the PERC 210 solar cell market.

Topcon 183 solar cells (efficiency of 25% and above) are priced at approximately 0.285-0.295 yuan/W; Topcon 210RN solar cells are priced at 0.275-0.285 yuan/W; Topcon 210 solar cells are priced at 0.285-0.295 yuan/W.

Mainstream products of HJT 210 half-cell are priced at 0.36-0.38 yuan/W.

Production

Some integrated manufacturers' solar cell bases have gradually started holidays, while most specialized solar cell manufacturers maintain their operating rates.

Inventory

Leading solar cell manufacturers have low inventory levels, and due to recent production cut plans, inventory is still expected to decrease this month.

Modules

Prices

In the current module market, mainstream transaction prices for centralized projects are 0.63-0.68 yuan/W for PERC 182mm, 0.64-0.69 yuan/W for PERC 210mm, 0.64-0.69 yuan/W for N-type 182mm, and 0.65-0.7 yuan/W for N-type 210mm. The mainstream transaction price range remains stable. During the off-season, order volumes have significantly decreased, and some companies have lowered prices to stimulate cargo pick-up.

Production

Recently, some companies have continued to reduce operating rates or shut down production lines. January's actual production is expected to decline further compared to forecasts, while February's operations are expected to remain stable, with many orders accumulated for delivery in March.

Inventory

Starting this week, solar cell inventory has begun to increase, with shipments decreasing in the second half of the month.

PV Film

Prices:

EVA/POE PV Materials:

PV-grade EVA is currently priced at 10,400-10,700 yuan/mt. PV-grade POE transactions are priced at 12,000-14,000 yuan/mt.

PV Film:

The current mainstream price for 420g transparent EVA film is 5.29-5.46 yuan/m², 420g white EVA film is 5.67-6.05 yuan/m², 380g EPE film is 5.79-5.89 yuan/m², and 380g POE film is 6.84-7.22 yuan/m².

Production

In January, the planned production of PV-grade EVA is approximately 100,000 mt. In December, domestic PV film production was about 350 million m².

Inventory

As the Chinese New Year approaches, PV film manufacturers are gradually starting holidays, stockpiling activities are nearing completion, and the reduction in PV-grade EVA inventory has slowed.

Inverter

Prices

This week, inverter prices are as follows: 20kW at 0.12-0.16 yuan/W, 50kW at 0.11-0.15 yuan/W, 110kW at 0.1-0.14 yuan/W, and 320kW at 0.09-0.11 yuan/W. Inverter prices remain stable.

Supply and Demand

On the supply side, production remains stable and sufficient. Overall demand is mediocre, with large power string and centralized models accounting for most shipments.

Prices

3.2mm Single-Layer Coating: 3.2mm single-layer coated PV glass is priced at 19.5-20.5 yuan/m², with prices remaining stable.

3.2mm Double-Layer Coating: 3.2mm double-layer coated PV glass is priced at 20.5-21.5 yuan/m², with prices remaining stable.

2.0mm Single-Layer Coating: 2.0mm single-layer coated PV glass is priced at 11.5-12.5 yuan/m², with prices remaining stable.

2.0mm Double-Layer Coating: 2.0mm double-layer coated PV glass is priced at 12.5-13.0 yuan/m², with prices remaining stable.

Production

In January, domestic production fell short of expectations. With an increase in cold-repair furnaces, the total glass supply for January is expected to be less than 40GW.

Inventory

In terms of inventory, as some downstream companies have already stopped production for holidays, glass demand has started to decline, leading to a slight increase in inventory levels for enterprises.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Taxas de operação de molduras fotovoltaicas estáveis, expectativas enfraquecendo; a redução de estoques de lingotes de alumínio acelera, centro de preços do alumínio sobe [Análise SMM]
há 1 hora
Taxas de operação de molduras fotovoltaicas estáveis, expectativas enfraquecendo; a redução de estoques de lingotes de alumínio acelera, centro de preços do alumínio sobe [Análise SMM]
Leia mais
Taxas de operação de molduras fotovoltaicas estáveis, expectativas enfraquecendo; a redução de estoques de lingotes de alumínio acelera, centro de preços do alumínio sobe [Análise SMM]
Taxas de operação de molduras fotovoltaicas estáveis, expectativas enfraquecendo; a redução de estoques de lingotes de alumínio acelera, centro de preços do alumínio sobe [Análise SMM]
há 1 hora
[SMM PV Flash]
há 2 horas
[SMM PV Flash]
Leia mais
[SMM PV Flash]
[SMM PV Flash]
Uma importante planta petroquímica interrompeu ontem uma linha de retomada de produção e, hoje, outra linha começou a produzir LDPE. No curto prazo, o cronograma de produção da empresa manterá a produção paralela de uma linha de material de alta pressão e uma linha de material fotovoltaico. Após esse ajuste de linha, a escala de produção de material fotovoltaico da planta sofreu certa contração.
há 2 horas
[SMM Notícias FV] Projeto FV de 100 MW da Huaneng em Shenmu, Shaanxi, alcança conexão à rede em plena capacidade
há 3 horas
[SMM Notícias FV] Projeto FV de 100 MW da Huaneng em Shenmu, Shaanxi, alcança conexão à rede em plena capacidade
Leia mais
[SMM Notícias FV] Projeto FV de 100 MW da Huaneng em Shenmu, Shaanxi, alcança conexão à rede em plena capacidade
[SMM Notícias FV] Projeto FV de 100 MW da Huaneng em Shenmu, Shaanxi, alcança conexão à rede em plena capacidade
Em 31 de agosto de 2026, o projeto de geração de energia fotovoltaica de 100.000 kW de Huaneng Shaanxi Shenmu alcançou a conexão à rede em plena capacidade, marcando que a capacidade instalada da Filial de Novas Energias de Huaneng Shaanxi ultrapassou 3 milhões de kW. Desde o início do projeto de Shenmu, diante de múltiplos desafios, como o clima frequente de vento e areia no norte de Shaanxi, terrenos e formas de relevo complexos, condições de construção restritas e prazos apertados, todos os construtores uniram esforços, superaram dificuldades e buscaram a excelência. Eles implementaram rigorosamente os requisitos de segurança de produção e controle de qualidade, coordenaram cientificamente os planos de construção, otimizaram os fluxos dos processos construtivos e avançaram de forma ordenada nas tarefas-chave, incluindo a construção da subestação elevadora, a instalação dos suportes de fixação dos painéis solares, a colocação dos módulos, a instalação das linhas coletoras e a depuração e calibração dos equipamentos. Por meio de gestão refinada, construção padronizada e resolução sistemática de problemas, resolveram com eficiência as diversas dificuldades e gargalos durante o processo construtivo, avançaram de forma constante no progresso da obra e concluíram com êxito o desfecho perfeito, desde a primeira conexão à rede até a conexão em plena capacidade, demonstrando plenamente a velocidade, a responsabilidade e a qualidade da Huaneng.
há 3 horas