【100MW/200MWh! Datang Xinjiang Energy Storage System Tender】On June 20th, Datang Group issued a tender notice for the procurement of energy storage systems for the construction project of the 220kV汇集station in Dashitou, Mulun County, Xinjiang. The notice shows that a new 220kV汇集station will be built, with a supporting energy storage construction scale of 100MW/200MWh.
The scope of this tender includes lithium iron phosphate battery energy storage systems, including energy storage batteries, PCS, EMS, BMS, cables, special tools, spare parts, technical services, etc. The tender qualification requirements are clear, and bidders must provide the supply performance of lithium iron phosphate electrochemical energy storage system integration equipment with a single project capacity of not less than 100MWh (including at least battery prefabricated cabins or outdoor cabinets, PCS).

![Preços do magnésio sobem por três sessões consecutivas! Lado dos custos segue "em brasa", enquanto o lado da demanda luta para assumir o controle [Comentário SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

