Publicado: Jun 20, 2024 08:50
[SMM Morning Meeting Summary of Lead: Overnight lead price pressured to weaken, downstream long-term orders mainly for delivery and spot transactions sluggish] Macroscopically, overnight, the US dollar index hovered and fell slightly by 0.03%... In terms of fundamentals, the domestic supply-demand imbalance of raw materials continues to support spot prices. Domestic large-scale battery enterprises maintain stable production, but the order performance of small and medium-sized battery enterprises is slightly affected after their product pricing follows the rise of lead prices, and the long position of lead futures withdraws briefly to wait and see...

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
há 3 minutos
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Leia mais
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Advances Lead-Zinc Mine Restart, Targeting Commercial Production by End-2026
Bunker Hill Mining announced on September 1 that its Bunker Hill lead-zinc mine in Idaho, USA, produced its first lead and zinc concentrates in late June 2026. The operation is currently ramping up, with ongoing optimisation of underground mining and processing operations. The processing plant has a design capacity of 1,800 tonnes per day, with planned combined annual output of approximately 85,000 tonnes of zinc concentrate and silver-bearing lead concentrate. The company plans to supplement working capital through standby financing and concentrate prepayment arrangements, targeting full commercial production by the end of 2026. SMM forecasts the mine’s 2026 output at approximately 25,000 tonnes of zinc in concentrate and 10,000–15,000 tonnes of lead in concentrate, both on a contained-metal basis. Meanwhile, recent underground drilling at the Cate-8 mineralised zone returned maximum sample grades of 41.1% lead and 7.41% zinc. The company is assessing the feasibility of incorporating the zone into its near-term mine plan. As production ramps up, the mine is expected to provide incremental lead and zinc supply to North America.
há 3 minutos
SHFE chumbo recua 0,03% com longa sombra superior, consolidação nas máximas permanece intacta [Breve comentário sobre futuros de chumbo]
há 4 horas
SHFE chumbo recua 0,03% com longa sombra superior, consolidação nas máximas permanece intacta [Breve comentário sobre futuros de chumbo]
Leia mais
SHFE chumbo recua 0,03% com longa sombra superior, consolidação nas máximas permanece intacta [Breve comentário sobre futuros de chumbo]
SHFE chumbo recua 0,03% com longa sombra superior, consolidação nas máximas permanece intacta [Breve comentário sobre futuros de chumbo]
há 4 horas
Dados: Movimento do mercado SHFE, DCE (02 de setembro)
há 6 horas
Dados: Movimento do mercado SHFE, DCE (02 de setembro)
Leia mais
Dados: Movimento do mercado SHFE, DCE (02 de setembro)
Dados: Movimento do mercado SHFE, DCE (02 de setembro)
A tabela a seguir mostra a movimentação de metais ferrosos e não ferrosos na SHFE e na DCE em 2 de setembro de 2026.
há 6 horas
[SMM Morning Meeting Summary of Lead: Overnight lead price pressured t - Shanghai Metals Market (SMM)