[100,000-ton Lithium Electric Material Project Signed in Sichuan] Recently, the 2024 Investment Attraction Conference and Project Signing Ceremony of Shehong City, Sichuan Province, was held, and the Shehong Municipal People's Government signed a contract with Fulin New Energy for the cathode material precursor project at the conference.
The project is expected to have a total investment of 520 million yuan, with a fixed asset investment plan of 200 million yuan. After completion and production, the project will greatly solve the cost control and raw material supply issues of the group's existing cathode material projects. This is the third project signed and implemented by Fulin Group in Shehong.
![[SMM Análise Semanal do Mercado de Células de Bateria de Armazenamento de Energia 9.3] Oferta restrita de folha de cobre limita cronogramas de produção em setembro, preços das células de bateria de armazenamento de energia permanecem firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Preços do magnésio sobem por três sessões consecutivas! Lado dos custos segue "em brasa", enquanto o lado da demanda luta para assumir o controle [Comentário SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

