On April 9th, Hangzhou Yu Zhenggong started the construction of the energy storage battery management system intelligent manufacturing center project on plot number 26 in 【2023】.
The project is located in the Qianjiang Economic Development Zone of Hangzhou, with a total land area of approximately 35,000 square meters and a total construction area of approximately 108,000 square meters. The construction content mainly includes an ecological industrial park, intelligent production space, a technology research and development center, etc., forming an intelligent industrial park. After its completion, this project will promote the intelligent development of the energy storage battery industry in the Yuhang District of Hangzhou.
![[SMM Análise Semanal do Mercado de Células de Bateria de Armazenamento de Energia 9.3] Oferta restrita de folha de cobre limita cronogramas de produção em setembro, preços das células de bateria de armazenamento de energia permanecem firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![Preços do magnésio sobem por três sessões consecutivas! Lado dos custos segue "em brasa", enquanto o lado da demanda luta para assumir o controle [Comentário SMM]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

