Tianjin Power Grid EPC Project Wins Bid at 1.540 yuan/Wh

Publicado: Jan 29, 2024 09:22
【1.540 yuan/Wh! Tianjin Power Grid side electrochemical energy storage station project general contracting (EPC) wins bid】On January 26, the bid result of the general contracting (EPC) for the electrochemical energy storage station project on the Tianjin Economic-Technological Development Area East Area Power Grid side was announced. According to the announcement, China Energy Construction Group Tianjin Electric Power Construction Co., Ltd. has won the bid at a price of 72,218,742 yuan, with a unit price of 1.540 yuan/Wh. The project has a scale of 23.45MW/46.9MWh, and the bidder is Tianjin Teda New Energy Technology Co., Ltd. The project includes the construction of 1 set of 600kW flexible high-power inverter station (7 sets of 12 stacks per set, including 5 charging piles with natural cooling, each with 2 connectors and a rated power of 250kW; 2 liquid-cooled charging piles, each with 1 connector and a rated power of 600kW), 1 7kW AC charging pile, and 1 photovoltaic carport with a total installed capacity of 59.4kWp.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
【1.540 yuan/Wh! Tianjin Power Grid side electrochemical energy storage - Shanghai Metals Market (SMM)