On November 24th, the new Inner Mongolia Energy Solar Power EPC project, built by China Energy Construction Anhui Electric Construction Second Company, was fully connected to the grid and started generating electricity.
The project is located in the Shanghaimiao Town of Etokeqianqi, Inner Mongolia Autonomous Region, and covers an area of 511 acres with a total installed capacity of 20.1 megawatts. It adopts a new industrial model of "coal mining subsidence area + photovoltaic desert control", using "power generation on the board, planting under the board, and sand control" to create a green ecological mining area.
After completion, the project will revitalize the idle land in the coal mining subsidence area, drive the restoration of desertified land in the mining area, and play an important role in promoting the coordinated development of local energy development and ecological environment.
![[SMM Notícias FV] A 4.700 metros de altitude! O maior projeto fotovoltaico no médio e baixo curso do rio Yarlung Zangbo, no Tibete, foi concluído.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Notícias de Energia Fotovoltaica] Departamento de Energia dos EUA (DOE) investe US$ 12 milhões para desenvolver tecnologia fotovoltaica espacial](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Notícias FV] Construindo uma referência europeia | Projeto de sistema de rastreamento de 221 MW da Chiko Solar Energy na Itália é oficialmente lançado](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
