China Development Bank Has Issued More Than 340 Billion Yuan In Loans This Year To Support Urban Infrastructure Construction

Publicado: Oct 8, 2023 15:48
On October 7, it was learned from the China Development Bank that from January to September, the Bank had issued loans of more than 340 billion yuan to the urban infrastructure sector, including urban transportation, flood control and drainage, sewage and garbage collection, and treatment, cable duct bank and network, urban organic renewal, which provided strong support for the construction, renovation and intelligent upgrading of urban municipal and public facilities.

On October 7, it was learned from the China Development Bank that from January to September, the Bank had issued loans of more than 340 billion yuan to the urban infrastructure sector, including urban transportation, flood control and drainage, sewage and garbage collection, and treatment, cable duct bank and network, urban organic renewal, which provided strong support for the construction, renovation and intelligent upgrading of urban municipal and public facilities.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Os altos preços do cobre suprimem as compras a jusante, com taxas de operação e novos pedidos continuando a cair
há 42 minutos
Os altos preços do cobre suprimem as compras a jusante, com taxas de operação e novos pedidos continuando a cair
Leia mais
Os altos preços do cobre suprimem as compras a jusante, com taxas de operação e novos pedidos continuando a cair
Os altos preços do cobre suprimem as compras a jusante, com taxas de operação e novos pedidos continuando a cair
Os preços elevados do cobre e a fraca procura exerceram uma pressão dupla, mantendo a indústria de fios esmaltados numa tendência moderada. Esta semana, a taxa de utilização das máquinas na indústria de fios esmaltados caiu 2,47 pontos percentuais em termos semanais, e a entrada de novas encomendas diminuiu 1,14 pontos percentuais em termos semanais.
há 42 minutos
Preços elevados do cobre suprimem as compras a jusante; taxa de operação e novos pedidos continuam em declínio [Análise Semanal do Mercado de Fios Esmaltados SMM]
há 46 minutos
Preços elevados do cobre suprimem as compras a jusante; taxa de operação e novos pedidos continuam em declínio [Análise Semanal do Mercado de Fios Esmaltados SMM]
Leia mais
Preços elevados do cobre suprimem as compras a jusante; taxa de operação e novos pedidos continuam em declínio [Análise Semanal do Mercado de Fios Esmaltados SMM]
Preços elevados do cobre suprimem as compras a jusante; taxa de operação e novos pedidos continuam em declínio [Análise Semanal do Mercado de Fios Esmaltados SMM]
Taxa de operação das máquinas da indústria de fios esmaltados caiu na comparação semanal nesta semana (21 a 27 de agosto) ....
há 46 minutos
Capstone conclui aquisição de San Pietro, consolidando o distrito de cobre de Atacama
há 54 minutos
Capstone conclui aquisição de San Pietro, consolidando o distrito de cobre de Atacama
Leia mais
Capstone conclui aquisição de San Pietro, consolidando o distrito de cobre de Atacama
Capstone conclui aquisição de San Pietro, consolidando o distrito de cobre de Atacama
A Capstone Copper concluiu a aquisição do projeto de cobre-ouro-ferro-cobalto San Pietro, na região de Atacama, no Chile, em 31 de agosto de 2026, pagando US$ 25 milhões em ações da Capstone à New Golden Exploration Chile, uma joint venture da Golden Arrow e da SSA. Situado entre suas propriedades Mantoverde, Santo Domingo e Sierra Norte, o San Pietro adiciona cerca de 16.000 hectares de terreno altamente prospectivo. Os depósitos Rincones e Colla abrigam um recurso inferido de 492 milhões de toneladas com 0,23% de cobre e 0,05 g/t de ouro. Em um raio de 20 km, as concessões da Capstone agora detêm aproximadamente 1,6 bilhão de toneladas de recursos medidos e indicados, além de 1,4 bilhão de toneladas inferidas. Após a compra da Sierra Norte em 2024 e uma opção da ENAMI em 2025, o acordo consolida a infraestrutura do distrito e amplia a opcionalidade de crescimento futuro do cobre.
há 54 minutos