On September 20, the Shanghai Pudong New Area Development and Reform Commission issued the "Notice on Organizing the Second Batch of Photovoltaic Power Generation Special Fund Projects in Pudong New Area in 2023", which proposed that within the scope of the application, subsidies are given according to the installed capacity, with a subsidy of 0.40 yuan/watt (photovoltaic building integrated application (photovoltaic components as building components) project, the subsidy standard is 1 yuan/watt), and the maximum subsidy for a single project is not more than 5 million yuan.
Application scope: From March 1, 2023 to October 31, 2023, photovoltaic power generation projects with a single installed capacity of not less than 200 kilowatts (public institutions installed capacity of not less than 50 kilowatts) in the Pudong New Area (projects implemented in the Lingang area shall be organized by the Lingang New District Management Committee according to the relevant policies of the new district).
![[SMM Notícias FV] A 4.700 metros de altitude! O maior projeto fotovoltaico no médio e baixo curso do rio Yarlung Zangbo, no Tibete, foi concluído.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM Notícias de Energia Fotovoltaica] Departamento de Energia dos EUA (DOE) investe US$ 12 milhões para desenvolver tecnologia fotovoltaica espacial](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM Notícias FV] Construindo uma referência europeia | Projeto de sistema de rastreamento de 221 MW da Chiko Solar Energy na Itália é oficialmente lançado](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
