Suzhou TA&A Ultra Clean Technology announced that the construction of the company's battery-grade lithium hydroxide project with an annual capacity of 60,000 started in May 2022. At present, the project has entered the trial production stage. The progress is in line with the company's construction arrangement. In the follow-up, the company will arrange trial production in stages according to the production process and optimise the equipment and devices, to gradually achieve the designed capacity.
![[SMM Análise Semanal do Mercado de Células de Bateria de Armazenamento de Energia 9.3] Oferta restrita de folha de cobre limita cronogramas de produção em setembro, preços das células de bateria de armazenamento de energia permanecem firmes](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)

![Lithium Carbonate Market Weekly Review: 8.31-9.3 spot lithium carbonate prices rose first then fell, overall downward trend [SMM Weekly Review]](https://imgqn.smm.cn/usercenter/PPLUj20251217171727.jpg)
