Zimbabwe Chromium Industry Capacity Upgrading Project Officially Put into Operation
On January 23, 2023, Furnace No. 1 of the Zimbabwe Chromium Ferrochrome Production Capacity Upgrade Project was officially ignited and put into operation.
On January 23, 2023, Furnace No. 1 of the Zimbabwe Chromium Ferrochrome Production Capacity Upgrade Project was officially ignited and put into operation. The project was officially launched in 2022 with Hunan Shunfa providing all the funds. The project adopted the domestic mature semi-closed submerged arc furnace technology to upgrade No. 1 and No. 2 furnaces. The No. 2 furnace with a designed annual output of 87,600 mt of ferrochrome is expected to be completed by the end of March.
Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.