Secondary lead smelters operating rates dropped 1.3% this week

Publicado: Jan 29, 2021 16:11 (GMT+8)
Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

SHANGHAI, Jan 29 (SMM) — Operating rates across licensed smelters of secondary lead in Jiangsu, Anhui, Henan and Guizhou averaged 46.2% in the week, down 1.3 percentage points from the previous week, an SMM survey showed.

The average operating rates remained unchanged on the week at 47.1%, 70.2%, and 33.3% in Anhui, Henan and Jiangsu respectively.

The operating rate in Guizhou dropped 7.3 percentage points on the week to 37.8%, mainly due to Yongxin’s production suspension for holiday.

The alert for the heavy air pollution in Henan was lifted this week. Xincheng Power, Jinhui and other smelters resumed production, but Hebei Shichang and Henan Jiayi suspended production for holidays. Guizhou Dingxin and Cenxiang will enter the holiday next week, and Guizhou Huoqilin will also stop the refining production line. The operating rates are expected to drop further next week.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
há 2 minutos
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Leia mais
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
há 2 minutos
Masivo Intersecta 32,5 Metros de Mineralização Polimetálica em Cerro Colorado com Teor de 0,271% de Zinco e 0,141% de Chumbo
há 10 minutos
Masivo Intersecta 32,5 Metros de Mineralização Polimetálica em Cerro Colorado com Teor de 0,271% de Zinco e 0,141% de Chumbo
Leia mais
Masivo Intersecta 32,5 Metros de Mineralização Polimetálica em Cerro Colorado com Teor de 0,271% de Zinco e 0,141% de Chumbo
Masivo Intersecta 32,5 Metros de Mineralização Polimetálica em Cerro Colorado com Teor de 0,271% de Zinco e 0,141% de Chumbo
Masivo Silver divulgou os resultados do furo CC-26-001, o primeiro de seu programa de perfuração de 2026 no projeto Cerro Colorado, em Sonora, no México. O furo interceptou 32,50 metros, de 226,30 a 258,80 metros, com teores de 0,271% de zinco, 0,141% de chumbo, 7,0 g/t de prata, 0,025% de cobre e 0,010 g/t de ouro. Um intervalo separado de 5,10 metros, a partir de 215,10 metros, apresentou 0,611% de zinco, 0,121% de chumbo e 24,0 g/t de prata. O furo foi encerrado a 259,5 metros devido a dificuldades técnicas de perfuração, ainda em rocha alterada e mineralizada. A Masivo planeja integrar os resultados com informações geológicas, estruturais, de alteração e geofísicas para orientar a perfuração de acompanhamento, testando a continuidade lateral e vertical. A empresa afirma que todos os intervalos reportados são comprimentos perfurados e que as larguras verdadeiras ainda não foram determinadas.
há 10 minutos
【Flash | 5N Plus expande instalação em Utah para processamento de antimoneto de índio】
há 16 minutos
【Flash | 5N Plus expande instalação em Utah para processamento de antimoneto de índio】
Leia mais
【Flash | 5N Plus expande instalação em Utah para processamento de antimoneto de índio】
【Flash | 5N Plus expande instalação em Utah para processamento de antimoneto de índio】
5N Plus planeja expandir sua unidade em St. George, Utah, em aproximadamente 50%, com conclusão prevista para o segundo semestre de 2027. O local transforma antimoneto de índio e outros materiais especiais em materiais semicondutores, wafers, substratos e componentes selecionados, com capacidades de recuperação, purificação e crescimento de cristais. Novos equipamentos serão instalados progressivamente, mas a capacidade específica de InSb não foi divulgada; o valor de 50% refere-se à expansão da instalação, não à demanda de índio.
há 16 minutos