SMM Evening Comments (Jan 15): Nonferrous metals on the SHFE closed mostly higher, Nickel gained 1.19%

Publicado: Jan 15, 2021 18:14 (GMT+8)
SHFE nonferrous metals increased broadly on Friday January 15. Aluminium added 0.92%, lead advanced 0.4%, nickel firmed 1.19% and tin rose 0.35%, while copper edged down 0.09% and zinc shed 1.67%.

SHANGHAI, Nov 27 (SMM) – SHFE nonferrous metals increased broadly on Friday January 15. Aluminium added 0.92%, lead advanced 0.4%, nickel firmed 1.19% and tin rose 0.35%, while copper edged down 0.09% and zinc shed 1.67%.

Copper: The most-liquid SHFE 2103 copper contract edged down 0.09% to end the day at 58,690 yuan/mt, with open interest rising 6,508 lots to 122,000 lots.

President-elect Joe Biden on Thursday unveiled the details of a $1.9 trillion coronavirus rescue package designed to support households and businesses through the pandemic. The proposal, called the American Rescue Plan, includes several familiar stimulus measures in the hope the additional fiscal support will sustain U.S. families and firms until the Covid-19 vaccine is widely available. The plan is the first of two major spending initiatives Biden will seek in the first few months of his presidency, according to senior Biden officials. The second bill, expected in February, will tackle the president-elect’s longer-term goals of creating jobs, reforming infrastructure, combating climate change and advancing racial equity.

Germany’s economy contracted by 5% in 2020, according to full-year GDP (gross domestic product) data released on Thursday. Coronavirus cases have prompted several lockdowns on public life and economic activity in Germany. Chancellor Angela Merkel announced last week that the latest lockdown would be extended until the end of the month.

US first-time claims for unemployment insurance jumped to 965,000 last week amid signs of a slowdown in hiring due to pandemic restrictions, the Labor Department reported Thursday. The total was worse than Wall Street estimates of 800,000 and above the previous week’s total of 784,000.

US retail sales and producer price index (PPI) for December set for release tonight will be watched, and whether the March contract could steady above 59,000 yuan/mt tonight will also be watched.

Aluminium: The most-traded SHFE 2103 aluminium contract finished the day 0.92% higher at 14,875 yuan/mt, with open interest rising 9,076 lots to 139,000 lots. It is expected to move between 14,850-14,950 yuan/mt tonight.

Zinc: The most-active SHFE 2103 zinc contract closed the day 1.67% lower at 20,290 yuan/mt, a new low in 2021, with open interest decreasing 4,162 lots to 51,812 lots. Zinc consumption continued to weaken as downstream users started the Chinese New Year holiday in advance due to the resurgence of coronavirus in north China, which pressured zinc prices. Support below from the 20,000 mark will be watched tonight.

Nickel: The most-liquid SHFE 2103 nickel contract rose 1.19% to close the day at 132,390 yuan/mt after hitting a new high since October 28, 2019 at 136,500 yuan/mt earlier in the session.

Lead: The most-traded SHFE 2103 lead contract finished the day 0.4% higher at 14,905 yuan/mt, with open interest rising 1,516 lots to 31,781 lots. It will test support from 14,900 mark tonight. 
 

Tin: The most-liquid SHFE 2103 tin contract added 0.35% to close the day at 153,680 yuan/mt, with open interest rising 252 lots to 32,088 lots.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Hindustan Copper avança com financiamento de capex de US$ 776 milhões via QIP e títulos para expansão da Visão 2030
há 17 horas
Hindustan Copper avança com financiamento de capex de US$ 776 milhões via QIP e títulos para expansão da Visão 2030
Leia mais
Hindustan Copper avança com financiamento de capex de US$ 776 milhões via QIP e títulos para expansão da Visão 2030
Hindustan Copper avança com financiamento de capex de US$ 776 milhões via QIP e títulos para expansão da Visão 2030
Os acionistas da HCL aprovaram dois mecanismos de captação de recursos enquanto a empresa implementa seu programa de expansão Visão 2030. O plano quinquenal visa aumentar a capacidade de mineração por meio da expansão das minas existentes, novas reservas e revitalização de ativos legados.
há 17 horas
Pesquisa do Feriado Nacional de 2026 com Empresas de Processamento de Cobre — Tubo de Cobre [Análise SMM]
há 18 horas
Pesquisa do Feriado Nacional de 2026 com Empresas de Processamento de Cobre — Tubo de Cobre [Análise SMM]
Leia mais
Pesquisa do Feriado Nacional de 2026 com Empresas de Processamento de Cobre — Tubo de Cobre [Análise SMM]
Pesquisa do Feriado Nacional de 2026 com Empresas de Processamento de Cobre — Tubo de Cobre [Análise SMM]
Com a melhora dos cronogramas de produção de ar-condicionado, a pesquisa da SMM com 13 produtores de tubos de cobre mostra pausas mais curtas no feriado nacional, com média de 3,3 dias — 0,6 dia a menos que no ano passado. Quatro produtores do leste da China operarão durante todo o feriado. Espera-se que as taxas de operação de outubro se estabilizem na comparação mensal, com uma queda anual bem mais estreita. No entanto, os pedidos continuam fracos, deixando incerta a força do “Outubro de Prata”.
há 18 horas
HBIS Resources: Parte principal do projeto de cobre Fase II essencialmente concluída, atualmente em fase de aceleração da capacidade
há 19 horas
HBIS Resources: Parte principal do projeto de cobre Fase II essencialmente concluída, atualmente em fase de aceleração da capacidade
Leia mais
HBIS Resources: Parte principal do projeto de cobre Fase II essencialmente concluída, atualmente em fase de aceleração da capacidade
HBIS Resources: Parte principal do projeto de cobre Fase II essencialmente concluída, atualmente em fase de aceleração da capacidade
há 19 horas