Chongqing to implement safety measures on coal mines

Published: Dec 15, 2020 09:25
Chongqing is stepping up precautionary measures in response to increased fatal accidents at coal mines.

SHANGHAI, Dec 15 (SMM) – Chongqing is stepping up precautionary measures in response to increased fatal accidents at coal mines.

Chongqing has formed a work committee and formulated "Ten Measures for the Safety Management of Coal Mine Shutdown" (hereinafter referred to as "Measures"), in accordance with the work requirements from the State Coal Supervision Bureau and the State Council.

The "Measures" require that all coal mines in the city stop all underground operations except for ventilation, drainage, gas inspection, safety monitoring system maintenance and other daily security operations.

Areas with serious safety threats must be sealed in a timely manner according to regulations. Also, the coal mine leader must strictly implement a shift system for workers. All shafts must be temporarily or permanently sealed before stopping the main ventilator, so as to prevent unauthorised entry of the poorly ventilated underground tunnels.

The authorities  have formulated a "one mine, one policy" shutdown safety guarantee work plan to avoid solo workers underground, and ensure the safety of daily security operations such as underground ventilation, drainage, gas inspection and safety monitoring system maintenance.

The coal mine safety guarantee work plan and measures shall be reviewed by the district and county coal mine safety supervision department in conjunction with the local coal mine safety supervision branch and strictly implemented.  The date of implementation of the Measures is yet to be confirmed, according to local reports.

At least 23 workers in southwest China have been killed after being trapped underground in a coal mine in the city of Chongqing recently.  The latest incident is the region’s second such accident in just two months, according to local media reports.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
Apr 17, 2026 09:31
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
Read More
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
JISCO Unveils China's First Zinc-Aluminum-Magnesium Product After Six Years of Research
According to China News Service, on April 16, at the plant of Jiuquan Iron and Steel (Group) Co., Ltd. in Jiayuguan City, Gansu Province, automated equipment was producing a new generation of zinc-aluminum-magnesium products. It was reported that the group assembled a specialized team to tackle zinc-aluminum-magnesium technology. Against the backdrop of formidable external technical barriers and the absence of batch production track records in China, the team spent six years of intensive efforts to produce China's first coil of zinc-aluminum-magnesium products with proprietary intellectual property rights. At the end of 2025, JISCO's new generation of zinc-aluminum-magnesium products was unveiled. This product category represents the most technically challenging variety in the hot-dip galv
Apr 17, 2026 09:31
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Apr 8, 2026 11:12
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Read More
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
Indonesian Ministry Approves Environmental Feasibility for Dari Lead-Zinc Mine Project
According to an announcement by NFC, on April 2, 2026, Zhongse Indonesia Dari Mining Co., Ltd., a holding subsidiary of China Nonferrous Metal Industry's Foreign Engineering and Construction Co., Ltd., obtained the "Environmental Feasibility Decision (SKKL) on Mining Activities of Lead-Zinc Ore by Dari Mining in SilimaPungga-Pungga Township, Dari County, North Sumatra Province" issued by the Ministry of Environment of the Republic of Indonesia. According to NFC's disclosure, the mine is an underground mine with a designed capacity of 1 million mt/year. As of 2024, the total resources/reserves of the Dari lead-zinc mine were: ore volume of 20.7009 million mt, zinc metal content of 2.2562 million mt, lead metal content of 1.3203 million mt, with an average zinc grade of 10.90% and an average
Apr 8, 2026 11:12
Chongqing to implement safety measures on coal mines - Shanghai Metals Market (SMM)