[SMM investigation] low-cost waste batteries are in short supply. Weekly operating rate of recycled lead is 48.8%.

Publicado: May 29, 2020 16:01 (GMT+8)

SMM, May 29th:

According to a survey by SMM (SMM), this week (May 23-May 29) the weekly operating rate of SMM recycled lead smelters in the four provinces was 48.8%, down 0.8% from last week.

Among them, the operating rate of Jiangsu recycled lead licensed smelting enterprises is 53.3%, and that of Anhui recycled lead licensed smelting enterprises is 45.2%, which is the same as that of last week. Affected by the shortage of waste battery supply, the operating rate of recycled lead enterprises in the two places is difficult to fluctuate significantly; the operating rate of Henan recycled lead licensed smelting enterprises is 60.8%, which is 15.3% higher than last week. Because Jiyuan Jinli opened one more production line, daily production capacity doubled. The operating rate of licensed smelting enterprises of recycled lead in Guizhou was 36.7%, down 21.4% from last week, mainly due to environmental protection inspection by the Guizhou Provincial Department in Guizhou area, local recycled lead enterprises suspended production for 2mi for three days, and some enterprises were overhauled.

Click to sign up for SMM 2020 (15th) lead and Zinc Summit

The QR code in the scan picture applies to enter the SMM lead industry exchange group and receives the SMM lead industry newsletter every day.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
【Flash | Motores ópticos de IA integrados em InP entram em remessas em volume】
25 Sep 2026 14:32 (GMT+8)
【Flash | Motores ópticos de IA integrados em InP entram em remessas em volume】
Leia mais
【Flash | Motores ópticos de IA integrados em InP entram em remessas em volume】
【Flash | Motores ópticos de IA integrados em InP entram em remessas em volume】
NewPhotonics e Tower Semiconductor anunciaram embarques em alto volume de motores ópticos integrados a laser para infraestrutura de IA. Os PICs de 800G e 1,6T usam a plataforma de fotônica de silício PH18DA da Tower com componentes InP integrados de forma heterogênea, permitindo lasers, SOAs, moduladores e fotodetectores em um único chip. Embarques em volume de chipsets NPO de 6,4T estão previstos para o primeiro semestre de 2027. A SMM acredita que isso sinaliza que a demanda por interconexão óptica de IA está se traduzindo em demanda por dispositivos InP, apoiando o consumo de índio de alta pureza. No entanto, os volumes de embarque e a intensidade de InP não foram divulgados, portanto o aumento de índio no curto prazo ainda não pode ser quantificado.
25 Sep 2026 14:32 (GMT+8)
Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? [Análise SMM]
25 Sep 2026 08:02 (GMT+8)
Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? [Análise SMM]
Leia mais
Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? [Análise SMM]
Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? [Análise SMM]
[Análise SMM] Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? SMM, 25 de setembro: De acordo com o aviso do Gabinete Geral do Conselho de Estado sobre os arranjos de feriados para 2026, o feriado do Festival do Meio do Outono deste ano vai de 25 a 27 de setembro, totalizando 3 dias; o feriado do Dia Nacional vai de 1º a 7 de outubro, totalizando 7 dias......
25 Sep 2026 08:02 (GMT+8)
Como serão os cronogramas de feriado e o ritmo de compra/venda dos recicladores de baterias sucateadas durante o feriado duplo do Festival do Meio-Outono e Dia Nacional de 2026? [Análise SMM]
24 Sep 2026 21:07 (GMT+8)
Como serão os cronogramas de feriado e o ritmo de compra/venda dos recicladores de baterias sucateadas durante o feriado duplo do Festival do Meio-Outono e Dia Nacional de 2026? [Análise SMM]
Leia mais
Como serão os cronogramas de feriado e o ritmo de compra/venda dos recicladores de baterias sucateadas durante o feriado duplo do Festival do Meio-Outono e Dia Nacional de 2026? [Análise SMM]
Como serão os cronogramas de feriado e o ritmo de compra/venda dos recicladores de baterias sucateadas durante o feriado duplo do Festival do Meio-Outono e Dia Nacional de 2026? [Análise SMM]
24 Sep 2026 21:07 (GMT+8)